for reference only, does not guarantee the accuracy!
1,
black coach sneakers 很有意思的一组照片,
ed hardy sunglasses for women, the amount of cement 160Kg /
2, the amount of 140-160 with a brick block /
3,
ed hardy long sleeve dresses 六种常见鸭病专家开出, ; steel consumption 18-20Kg /
4, area = 0.7-1 times the plaster wall construction area
5, Interior area = 1.7 times the plaster floor area
6, interior plaster area = 3-3.4 times the building area
7, 240 brick wall 529 / m3; 370 brick wall 522 / m3; 490 brick wall 518 / m3; 120 brick wall 552 / m3; 180 brick wall 539 / m3; 60 brick 606 / m3
8, ; wall tile area = 0.3-0.33 times the building area
Second,
puma discount, the project cost:
1,
white jordan shoes A man, brick :620-630 yuan /
2, frame :900-1100 Yuan /
3, bottom frame structure :650-680 yuan /
4, wall structure: 1200 yuan /
5, short column shear :860-900 Yuan /
6,
buy puma shoes, factory framework: 1300 yuan /
7, Villa :1000-1200 yuan /
8, building the framework :1300-1500 yuan /
three concrete floor plastered 3 / bag
four frames:
1, the amount of cement 175-190Kg /
2, the amount of 110-130 with a brick block /
3,
nike air max 95, Reinforcement Steel 35-40Kg /; public buildings, 50-60Kg /: factory: 70Kg /
4, 0.7-0.9 plaster wall construction area
5, interior wall plaster area = 1.7 times the building area
6, sticky gray area = 2 times the building area
five, loss
wall tiles: cross-posted 20-25%; vertical paste 10-15%;
six,
jordan dub zero 2009, with more than
C10 Mix 1 : 3.97:4.66:0.85 amount of cement 235Kg/m3
C15 with the amount of cement than 1:1.769:3.76:0.49 325Kg/m3 ; pumping
C20 with the amount of cement than 1:2.08:3.69:0.58 330Kg/m3 2: 4:6
C25 with the amount of cement than 1:1.74:3.23:0.47 with 373Kg/m3 2:3:5
C30 amount of cement than 1:1.48:2.76:0.41 424Kg/m3 2:2:4 2:1:2
C35 with the amount of cement than 1:1.67:3.25:0.44 398Kg/m3 2;: 2:3 42.5 Cement