Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Free Advertising Forums Directory > Message Boards Directory

Message Boards Directory These are similar to forums, but the posts are listed in chronological order and not by category. They also dont require any registration.

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 06-21-2011, 11:05 AM   #1
SW3u0t7h7uv
 
Posts: n/a
Default Summary of experience in fitting 99

1, waterproof film construction should accept the deep water;
2, waterproofing ought be secret after completion and approval of construction;
3, waterproof construction to do 24 hours after completion of elementary water testing;
4 , bathroom waterproof wafer should not be less than 1.8m;
5, floor drain, Yin-Yang angle, pipe should do it again at the water;
6, floor drain floor drain should be used Fangchou;
7, the right of hot and cold water pipes Left cold heat;
8, water from the ground and try not to go;
9, the cold water pipe in the wall should be 1cm layer of protection, hot water pipes to 1.5cm;
10, PPR pipe to be installed consider the thickness of stickers, prepared to tile, so the tube will not be exposed;
11,GHD Benefit Straighteners, the sink must be for large for possible;
12, and the basin guiding to complete, or simulate not to go;
13, the toilet installation can not use cement, use silicone (pearly);
14, after going to toilet faucet installed to defend the (product protection);
15, to consider when buying toilet toilet from the pit;
16, rinsing machine to consider is the drainage or the next drainage;
17, the bathroom is best not to tel, and easy to damp;
18, to consider a good size bathroom mirror, mirror front lamp is easy to install or higher;
19, toilet pipe is best to stay manholes;
20, strong, languid can not wear a pipe inside the same;
21, the left ground zero on the right phase;
22,GHD Rare Straighteners, to 300 from the power channel, alternate 1.4 m;
23, switch not installed in the door behind;
24, outlet should be a lot of good;
25, with a 16A high-power electrical outlet;
26, dark pots to use good;
27, dark boils to reserve the table complete, or is not installed on;
28,GHD Purple Straighteners, PVC pipe threading wire cross-section, not more than threading pipe cross-sectional place of ​​40%;
29, bedroom air-conditioned not to implantation ;
30, climate holes to consider the mundane tilt, or drainage will flow in.;
31, light too consider the twin control;
32,GHD Diamond Flag 2011, the best bathroom installation splash;
33, balcony to consider a protective tube;
34, bad wire to flat, vertical;
35, to consider the prevalent flue Shangni valve;
36, bought appliances must look at the manual personnel;
37, manual insurance card must be kept well;
38, cement creation phase exceeding three months can not be accustom;
39, differ varieties of cement can not be mixed;
40, some sand try to use savor to know his mouth dirt;
41, wall and floor tiles to be dried and overran more than 2 hours to paste;
42, wall and floor tiles fewer prefer than buy some do not arise to buy or color;
43, a wall can not have two non-whole bricks;
44, instantly after achievement of exploration coupler clean up of the tile;
45, the floor glue marble (light) waterproof stone back to do;
46, Yang turn to cut 45-degree angle;
47, floor tiles to the floor drain at the tilt, or easy seepage;
48, pipe wall along the mouth to the use of sets of tearing method, so it looks complete;
49, floor marble should open mart;
50, must be sand floor tiles, slide Do not equitable to see good;
51, matte tiles complicated to clean;
52, to pay care to the drainage tile balcony direction;
53, the keel is best to use dry larch;
54, later a colossal wooden materials bought ambition dry;
55, approach the child 1st playing level carpentry;
56 , color panels come in to buy a paint brush again
57, the shoulder can not be installed in the ceiling hanging keel;
58, ceiling hanging bars from the wall shall not exceed 200;
59, color panel construction to pre-pick color;
60, gypsum board to use self-tapping screws into the board 1-2mm, and anti-rust treatment do not clutch the nail with;
61, the distance between plasterboard fixes may greater than 200;
62, gypsum wall board with a 3mm suture because crack treatment;
63, gypsum board to do the best sun angle at the angle of the sun protection;
64, doors at the upper and lower brow brush to paint;
65, the bottom of the bathroom door pockets to swipe waterproof handbook;
66, the size of the door height should be consistent;
67, furniture, try not to do carpentry,GHD MK4 Pure Straighteners, do can be done;
68, try to buy the whole cabinet, woodworking done well;
69, must consider the good of entire sizes, change up more trouble;
70, make their own shift gates do not do dark orbit, after no course to mend;
71, the bathroom small space, try to do the sliding door;
72, not sure of carpentry, we must communicate more with the foreman, do not let them self-assertion ;
73, money in hand is the last word;
74, have kid at home to use less ground glass;
75, be sure to let workmen take to look the drawings;
76, pantry is pumping conference advantageous;
77, floor flatness wood keel is 5mm;
78, between the floor joints staggered;
79, floors and wall to depart 8-10mm among the joints;
80, compound layer width of more than 8 meters must think the expansion joints;
81, to minimize the use of secret embark do Door;
82, hinges and hardware must use good;
83, Yuba wood to be installed in keel, can not be directly mounted on the dome;
84, in the black paint goes, try not watered, good bad or effortless;
85, gypsum board joints to be above the ribbon;
86 , where there are gaps on the wall truly cool napkin is better;
87, the best to eliminate the aboriginal walls and some putty alternatively glue brush repeatedly Sealing;
88, try to buy a brand paint, elaboration company suggested not known or recommended at the boss do not try;
89, the weather is too wet paint Do not brush;
90, a painter must await ahead the next an after the paint dry;
91,GHD IV Pink Straighteners, paint lustering to wait after entirely dry;
92, the metal behind to do anti-rust dispose;
93, chilly weather, the quality will be penniless painter;
94, paint the door, the use Masking stick hinge and door locks;
95, also hot to pay attention to airing;
96, wallpaper paste, brush the varnish to the wall;
97, wallpaper paste, should the switch , socket panel cleared to;
98, light, silky cream paint to a complete supplement of prone to colorful aberration;
99, hit off the assembly line installed to use putty and draw fill joints;
  Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 10:52 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum