Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Free Link Exchange

Free Link Exchange Free Link Exchange

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 08-23-2011, 06:31 PM   #1
R8r5b7y7zf
 
Posts: n/a
Default 200 {elaboration} tips ( {marital}, no{marital}ed

1, the partition will not be the first shoe, leaving a little space so that shoes can leak into the bottom ash, sink and gas stove top mounted light. Given the location of the bathroom floor drain must first think well, a good amount of size. Drain the best side in the brick, the brick in the middle position if so, how to tilt either brick, floor drain is not the lowest point.

2, bathroom, air-conditioning outlets were not designed to switch. Especially the bathroom water heater, a couple of level switch with a plug appropriate. To get cracking electric, pull the plug perilous

3, sun angle on tile part of the treatment, in the final inquiry is to look at worker level. If the class of good workers, plasterers, tile tools and wear better, they should not hesitate to choose the practice of grinding 45-degree angle. In effect, as long as a good grinding, grinding 45-degree reach angle of the sun angle is the most beautiful! If the level is absolutely not very good worker, then you still choose to use affirmative angle of it, because the mill's wrong practice not as good as 45-degree angle with the angle of the sun's effects.

4, line up the pipes after the water pressure test is also very important. Test, we must all be present, and the test for at least 30 minutes, conditions permitting, the best one hour. 10 kg oppression, without any abatement before the final test.

5, when the steel doors steel doors must be considered a good size frame protruding walls to accuse the installer, production the ultimate border and had finished the wall tiles are smooth, so not only beautiful, and good health to do.

6, carpenter and mason's Door package is to knot the tiling, including door pocket of time to consider the following ground (the ground side of the door either side) is also tiled cement mortar or other thing,Nike Shox R4, because if you paste porcelain Door Nail good before, has packages to the ground, with cement in the future, if cement and Door stained, moldy water will cause wood Door

7, under the mattress and mattress board must be breathable. Bed board is generally best to use cedar board

8, do the paint as much as periodical tape

9, buy a lamp to note: generally try to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other coating steel plated, ah, ah what kind of paint, easily fade.

10, consist in ... ceramic basin basin, glass basin downright Health

11, water reform plan to be their own good, ask them to open the straight-line Cao. Watching them paint their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.

12, water must be good, be sure to test the water!

13, a lot of construction in the verbal agreement into the gap checkout massacred, must be written in black and white, increase or decrease in prices of items are sure to ask, write it!

14, ground floor, if installed, to re-do all the ground re-smooth cement floor.

15, the kitchen door, or the decoration of wood to make wooden hanging rail doors for good.

16, the living room as much as possible to install the power plug.

17, is still to be done outdoor the shower restroom partitions. Not trouble the easy direction to drag a shower curtain, the actual inconvenience, water everywhere.

18, do door and door frame of the wood material to choose cautiously the material.

19, before installing the cabinet must be sure your home's water is OKAY.

20, kitchen floor tiles will not elect white.


21, paying particular attention to the ceiling smooth putty before wiping Dulux

22, the number of alive room lighting should not be too light, simple is better, or like the lighting shop!

23, to buy the things you need to install those dealers will be necessary to install, it does not include installation, after installation, it must adhere completely to pay money! !

24, decoration, your formerly collected business cards contractors carry

25, Lvkou Ban protective film is best removed before installation.

26, the shoe is best to use shutter, anti-odor. You can leave a shoe outlet side, to plug bake shoes.

27, where the cooking can be a small security lights.

28, it is convenient restaurant exhaust flare can also be secure, so when you eat hot pot or do not dirty grill house hall ceiling.

29, the door is best placed to lay a debris of the cupboard, can be placed on the boot. The common asset, such as umbrellas, bags, scissors, coins, and so dine of the drugs in there, so it is convenient.
30, there is no need to use your ceiling, as not too anxious about moisture and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, a passenger guard my house to do so, very beautiful. If you must use Lvkou Ban ceiling, it is recommended:
1, not too expensive.
2, using the web color, especially the kitchen ceiling, white on the good, and white unless color and decoration style of match, it will easily inconsistent.
3, his gripping idea, do not believe selling the vision of smallpox, their eyes Barbara taint.
4, staring at himself in the scene, meantime income is important, do not let them slack, or leave the dark seam, how to look how ugly.

31, third day of the main hole and continue to paste tiles, range hood and vent water heaters to pre-lay, and if so then perforated tiles affixed good, is not convenient. Therefore, the decoration must be selected before the hood, stoves and water heaters, etc., to determine the hole size.

32, although taking into account the custom-made cabinets look good, but not durable, comprehensive online views and experiences of some students, the use of cement to do to counter the structure of internal and external sides of glue porcelain, marble countertops, wall cabinets and counters wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And the price is small. Many neighbors said looked good, I did not thump.

33, well after the Door, plasterers plaster line to start the installation, wall Pihui project. My family had relatively smooth wall, approved 2-3 road on it. Pihui granted when a gray polished once, and then paint brush after brushing but also lustered, and finally twice with ICI paint brush, the whole wall look smooth and flat, really good. Upon achievement of the ceiling wall, carpenter started wardrobe. The wardrobe is 18cm Albert card Daixinban do outside paste veneer, although there is no furniture store to buy so good-looking, but durable, quality should be better than buying. I am not afraid of standing container board. Buy probably will not work. Backplane is relatively thick, thin to buy that.

34, when other students in the tiling must note the following:
① best he can in the field.
② some of the less faultless tile can be attached to the future of some workers to see the location, such as cabinets, sinks, mirrors backward, but also pay attention to tile, brick, etc. Do not waist was attached to the above position of workers, or What you can not see the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the torrent harm must be enough time.
④ Be sure to drain plug with something good out of cement down to discourage clogging. My family out because the cement floor drain is blocked, it took 30 management office to find clear, wake a lot of small dirt.
⑤ at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of brick, very melancholy, all perspiration Mimi Yeah.

35, a wall of long, tall. Such as a bathroom with four walls, each wall should meter out its long, tall. And then deduct a window and door area. Finally, calculate the ground space. After you put a good amount of size, you can also get to sell tile sub shop, they will help you re-match. Plus 5 percent-losses on the line.

36, the best is a two bedroom roof light control, and a door, a bed,Nike Shox TL1, a bed of winter save up and then rotate off the lights.

37, the socket must be considered a good location, height, interval. Even first play location having steel cassette, put away after a cassette is found just by TV cabinets, microwave, table stop, the first two had to move the location of furniture, high, and finally found not only ergonomic height, but can not be bought a good fit stainless steel cabinet legs, only customized aluminum feet.

38, fair around the corner in the hallway like the one installed, that there are sunny effect.

39, when mounted lights did not consider the placement of the table, the table now is not in the medium of light.

40, bathroom tiles do not use too much pigment, one easily dirty, and secondly, a long time too blunt!


41, outlet to more equipment, furniture to buy outside the ground to be considered safe to dirt, kind of room to look, in principle, to adhere to.

42, Lvkou Ban did not need to buy high-priced, very cheap Lvkou Ban the effect has been far better than PVC, the more money I can not see significantly different results. Buy Lvkouban particular attention to the keel and not Lvkou itself (Lvkou goal is not easy to tamper too much), usually on the keel complete ghost.

43, brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to achieve satisfactory results. This is indeed the bricklayer himself put forward good suggestions.

44, playing in the balcony on the top cabinet on the back of the cabinet, then a layer of bubble board insulation with water works well. Balcony door is best to use the same type of fire board. Balcony environment is bad.

45, if no suitable molding may wish to order, custom-made quality also seems better than the example. More personalized and customized.

46, bathroom ground cabinets with stainless steel thighs are huge profits, the back of the store to find some place to buy cheap price mad.

47, install the door latch head to pay attention to some wax, wax on and then crashing too late. If you do not smoke, then also pay attention to the door handle to prevent wall damage.

48, Paco floor well, I like only to remind the owner to talk directly to the price and the seller to talk about than the price better.

49, matte paint is high and the light beautiful

50, if the re-decoration will use putty instead of talc products.

51, installation and air leakage protection switch coalition box of the project can not be provincial, but not on the outside to be on the interior, the original will want to save wages outside the old junction box used, electrical proposal put In the indoor ones, and now he found this suggestion very valuable.

52, and air leakage protection switch to use the brand name. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone number, and then played to ask the local branch number.

53, Under Counter Basin Above Counter Basin than delicate, nice, good clean. Basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leading to the mouth longer.

54, without anybody revision of the wall angle is also very beauteous, yet to find a painter in the advance stage and the painter clearly put amenable. Ding Jiaoxian angle assists to activity a straight line.

55, online slots before the cement surface of the putty surface treatment is important, for no solid surface with a clean ball treatment is very appropriate.

56, make plaster suitable for a great chasm on the walls, of lesson, if the hole is too large or absence to use concrete.

57, frosted glass, not stained with the back of ten million to protect the paint, is difficult to wash!

58, Caipen leading back of the hand switch must be used, that must be not easy to keep clean fingers, the hands are turned up when the oil is also difficult.

59, the price of elegance automatic racks too much water, and found some of the more renowned brand is not on the structural design but better than the brands, prices are much lower.

60, could be considered safe on the ground of the metal socket, the socket 100 is very expensive, but very convenient, usually flush with the ground, feet a foot on the socket can pop up. Suitable for large living room. Or security in the dining room table below, to insert pot (to prevent hanging back and along when moving wires)


61, storage room. TX has been said, but I did not do doors, looks very beautiful, and easy to put dirty clothes cupboard.

62, starting bed frame (the so called it). I am a professional company to buy the linen bed, bed, and spent 350 yuan plus a such a thing, end of the bed there is a pull handle, bed board will turn up, exposing the bottom of the storage space, Terrific Oh!

63, is not practical double-pole towel rack! Current and single-pole uses the same basic look inside layer will not be hanging pole and then drying towel

64, that is not practical cabinet inside the trash can, as on the outside. There do not install the door and the table plate of the trash bin, open the door when the summer will be very smelly. Trash or on the outside good.

65, the table next to the small cabinet, and can be placed on some stuff, very convenient.

66, on I think the mop bucket less claiming in terms of rendition, can convene one yourself out, covered with tiles and match the surrounding environment or the mosaic that is beautiful, and save money.

67, the bathroom can fix nail point of hook to hang something.

68, designed a bathroom cupboard to put clothes, no longer must worry about bathing forgot to clean clothes.

69, underwent a caustic practical washing machine with dryer, in increase to a annual, merely the yellow mold-day, and the evil mammoth. Thick clothes, towels or drying quit, let the sun more than a good consumer disinfection. Even been overdrawn, you need to save the point of silver.
70, even in the laundromat room to do a laundry pool, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundry pool, became my most frequently used a home washing area. What rag ah, socks, ah, to towels, ah, all in which to wash, even the most hands there too.

71, fitted with lights is not really practical, not the decoration finished now opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under romantic, now do not have much accident of opening spotlights.

72, most fitting experience is actually as easy as possible, less pollution, less money, truce of mind.

73, useful stuff:
①-designed cache room.
② North Terrace used to wash filth sink. Differences between the bathroom sink and kitchen sink washing trays and vegetables.
③ bathroom to wash your cilia you can pull out the leader. (Wash basin was not the TX exceptions).
④ easy to clean the floor and the right cleaning tools.
⑤ kitchen work table bulbs.

74, to buy their own toilet must be a good amount of pitch, or go buy a return that is really ... ...

75, posted WeiChu tiles after a good amount of what did not dry before the best level, the lowest point is not to look at the leak, or other dry and then passing the buck and decoration team, a lot of dead cells.

76, ledge stone with the Great Wall of beads Angeles, is a 800X800 tiles. Manufacturers cut good milling, Mason posted. Pattern did not look good also
radiation.

77, bathroom shower room must be large enough size, and use perspicuous glass, so there does not appear cramped shower.

78, should not use white cement tiles pointing anchor. No month into a black seam, ugly death. The results they have bought their own hook pointing agent, that tired

79, the cabinet should be under the artificial stone after the board of the pad, the result is not found after installation, are now afraid to cut the meat in the above, agreed to give me almost two months have not installed installed (only to grinding a).
80, do not believe the spell of the designer. Of course, you can visit more than several decoration companies, from each design to extract the real useful things, the key is you want to masquerade to look like home promotion.


81, if the floor drain installed the original developers have the kind of injure smell of the

82, attached bathroom floor tiles after a good test the water, if water is relatively slow instantly rework. Our household's water is relatively slow, then relented a bit, now it is always a little bath water, and made hundreds of our main Guardian silver shower head is laze, it always wondering how to remedy.

83, fitted wash basin and mirror to be considered good, put brush glass rack, towel rack relating rank.

84, to consider when buying a mirror the mirror front lamps, if you do not want to install a temporary mirror front lamps, mirrors the size of the mirror to be able to cover for the best line of headlights reserved.

85, put the washing on the balcony to be a small cupboard, easy to put some debris, such as washing powder within the debris. Both beautiful and practical

86, must be looking at doing upstairs upstairs dropping water .... otherwise, get a hanging cabinet, the wall is a shambles ....

87, do not blindly follow the buy online, I later discovered that some of their own to buy cheaper than the bargain.

88, television wall must set a few more outlets, television, DVD .... a put, you will find enough channels.

89, change the water well in the future to be considered before the installation of a large sample of wash basin, for example, the left or right pots pots, water and drainage that is situated where. Otherwise, changing for the better after the breakthrough period of the wash basin is fit!

90, on the curtains, we had better put your linger a size goes, the foreman shows no less size. If less, then how come the. Or watched him cut his cloth.

91, the decoration of the construction process:
(1) approach, tearing down walls, walls.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this task).
(3) cutting trough,Nike Shox R3-R4 Combination, water reform and acceptance.
(4) seal groove hidden underground water renovation project, closed water leak test started without waterproofing.
(5) bathroom, kitchen wall attached disk.
(6) Woodworking approach, suspended ceilings, plaster moldings.
(7) packages Door, window cover. Making wooden cabinet frame.
(8) synchronous production of wooden doors, door style and platen.
(9) wooden panel paint brush dust (edible vegetable oil).
(10) window leveling arranging cruel countertops.
(11) neat panel, pasted, fine line production and installation.
(12) wall of primary treatment, grinding, leveling.
(13) utensils, door seams paste adhesive (protected side).
(14) ICI at least three times the oil the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, the baseboard.
(17) lighting, sanitary ware, handle, door lock installation.
(18) cleaning health, tiles fill joints, dismantling.
(19) decoration preliminary acceptance among the company.
(20) 3 prim approval of date, allocation owners.

92, the valve back together before the flue must be clean to ensure the valve can switch freely and able to open to the highest, otherwise it will affect the effect of smoke hood. Ceiling can be installed to remain two not installed, so the hood and try and correct installation of the ceiling and then installed.

93, so much in the living room and dining room ceiling can not do not do.

94, take the line in array to better air-conditioned spaces, the power as much as possible closer to the air, so air-conditioned to see a length of cable, leaving a trace of regret.

95, the house in person to measure and disc the various sizes available, can be Broche size chart size and then re-covered wire marked the final size will directly affect the decoration and furniture purchases.

96, the small size of line is not good if the election is not always black walnut atmosphere, then the need for trade-offs, or to accommodate actual or devoted their own ideas, of course, the best do both

97, began looking for decorators. In terms of personal experience, if necessary particularly large family and propose to simple decoration, the guerrillas seem to find something more cost-effective. After installation it is best to introduce others, you have peruse and agree to the eyes, especially the consciousness of the human in charge of the decoration is even more important, responsibility and gratitude of how, some of the former is more critical, because if it were not for a stripped-down, in fact, those who live almost fooling the will to do, but the quality is good or bad may depend on a sense of liability.

98, the main furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. in advance to see more of the best also, if the running nigh on exhausted, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so then you have to do is slowly according to their desired neatness percolate out the right things. Some people take a good style, some people have accurate grasp of color, it does not matter, anyway, there is time to consider, if you wait until cleared decoration, furniture, help wanted to see the steps and then reluctantly approved the unavoidable end will not truly like it.

99, already optimistic about the best furniture to size down, and then to the room's decoration of the virtual future.

100, buy something required documents be sure to reserve the move on the latter may exist behind, a replacement is absolutely useful. In particular, some momentous items of the cache receipts, pamphlets, etc., because a lot of entities have a warranty period, certify lost would be more trouble.


101, the process of construction projects are sure to increase or dwindle the price they asked for and then write it in black and white.

102, check for the necessary construction of protective measures, such as entrance doors to use jewelry cotton wrap, window and floor tiling good must be properly protected.

103, as much as possible to communicate with construction workers, to determine whether he understands your aims. Put themselves in adore of each teacher's work, respect, the magnitude of people feel at home, then began to live it more responsible to do so? There is an old saying not to ask (But if you are faced with treacherous cunning bully who, it would have to revenge, discuss) in particular to some of the edge of the project is the need for several types of co-ordination, responsible workers with each other and coordinate their relative duties, Otherwise, we pass the money back and forth, all pass the buck. I like Mason to help me solve some of the carpentry of things, and electrical and solve some of Mason's problems. Because each teacher's experience is different, by the time he is willing to help you find a way.

104, do not do the best furniture fixed, because it no longer may be some changes in the layout. If we do we must grasp the quality, or infinite troubles.

105, be sure to change the water carefully, one costs money; second, if it were not for the ceiling from the floor must be laid down in water, if water problems big trouble.

106, according to their actual needs and reasonable preparations for wiring, so as not to waste (especially the cloth with a lot of lights and lighting if I were you practical, we must also try to avoid the sequence to use, waste electricity), but some places can not be Province, for instance, next to the bathroom mirror, and constantly with a hairdryer and razor; well inside or beneath if the shoe has a socket is also good, shoe device can bake, I am now very sorry that no cloth lines.

107, the bathroom as wet and dry area, if the area is small with a pedestal like (special glass basin was dirty, lazy caution); conditionally set a waterproof cabinet incorporating a small debris is best, put anything certainly does not look good on the outside.

108, wood glossy white paint brush than when the nitro-polyester good (this is to hear to experienced painters talk).

109, the cabinet must be selected carefully, to look at several of the quality, we go to do a solid strong as this one are easily thousands of sea, but also related to the stove and sink, etc., they still do not blindly mercenary cheap good. But best not to do in the cabinet table or inside the trash can; if there is limited funding, basket, basket seasoning, rice bucket of what you can do all of these accessories in the cabinets sell the company in general is very expensive.

110, wardrobe rather than not less, rather large not small, women memorize! Hanging space to be skillful to put up the clothes.

111, bad handling glass or mirrors in the vicinity of the best things to buy, or Be ready to transport methods.

112, curtains all the best in furniture, utensils and then customized approach to match the overall style tone. However, before cleaning the track can be installed.

113, change the gas pipe is best done before tiling, or may damage the wall. Best to let the gas company to draw a figure or on the wall as an arrow, because the cabinet company to be required in the cabinet body openings.
114, cabinet installatiin due time is longer, ranging from 4 to 5 hours, as numerous as 2 days, must be psychologically prepared. Installation can be used to check whether the material is that you set (you can see via the hinge hole cabinet material). Installing kitchen cabinets before the first clean look, because once installed cabinets, no way those die ends and then cleaned.

115, furniture installation is best looked at in the next, primarily as the closet of the laminates are several holes chose, I was not looking at the results too small a distance between the wafers, hanging clothes stretch not open, even after adjustment.

116, taking into account the formaldehyde pollution of the environment, such as spider plants can be placed in the green chamber, furniture in all the open doors the emission of odor, but also buy a special spray to exclude the smell of things to come.

117, installation of combustible gas, booking gas ignition.

118, brush lumber of the time: the best Puwan other room painted tile or lumber floors. If you must brush it, the best have the room cleaned. No floor tile or wood floor room, the room a lot of dust, then brush wood, then brush off the dust accessible accompanied to the wood surface, wood productions, have spiked sense does it feel, which however can be higher name of sandpaper and then brush it again to solve, but in the end it feels to feel the brush and the overall efficacy will be deducted RBI buffet. Room Puwan tiles and then brush, then the wind of dust content much less than the mart front, with virtually no brush again after the dust additional to the wood surface of wood productions. This is so because when they scamper into a small decoration Wu circumstance, I had decided to buy in Canada Wood had watched it like a brush effect, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of the effect to play a lot of discounts, it has been a matter of rue Xiao Wu. And plus I like the organization buy the paint process, the students also emerged in this home. So here remind students to pay attention to it. I do not know whether other wood case, but along to the principle of same reason, so here remind students to pay care to it.

119, on up painting: painting instructor pay is so dry and then batch finished wall putty, putty dry after painting. After brushing the paint if no reason is necessary to install lighting and a kind of electrical switches. Ask someone to install lighting and electrical switches to remind the teachers to pay attention to this and installed a clean Sin before hand, so that when installed will not be a filthy wall. Thus saving a touch-up painting processes the. Of course, soiled walls, the decoration is to make sure the paint division team to pay up painting again, that is to get clean and dirty walls (if the paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint). Just note, do not let install lighting division to pay tarnished walls, you can pay less to make a junket to the paint division (at least half a day), but also assist a lot of our own, then why not? Sometimes, with people easily, also has been easy. In general, paint the walls will be wood finish brushing before, this is to avoid the Wood in the process of dry brush will paint the walls of the wall shock. Of course, in actual operation, you can also Puwan after tile (floor tile wall putty prior permission has been good) painted wood, and other dry before whitewashing wood finish, but to do so, of course, will influence the duration. If the terror of affecting the duration of the case, but also in the air to reduce the effects of dust, then a lot of points to be diligent about cleaning the room of the health of the.

120, the decoration team selection: The first choice guerrillas or formal company, I think is not important, the key is to give you the head of the construction team is solemn and responsible, the decoration of the skills of workers, of course, the quality of the decoration and prices.
First, ascertain the elaboration companies not extra than 4, for the most chapter, so, whether your time is very rich, it is another stuff. And decoration companies to talk almost this ahead, must be remove that you have to do upkeep projects, you can shriek the enterprise reported that always the decoration items, contrast prices and comprehensive later catching into list the following elements to resolve which items you want to outsource Which item of decoration companies do.
the decoration of the people, the decoration of the offer as cheap as possible, of course, contrary to the views of decoration company. Sometimes the decoration company to Mohr-McClune, will offer some of the weight is relatively cheap, this way, the quality of the projects and the quality of materials is more difficult to guarantee. Fitting so many, you want to single item is the lowest, it is unrealistic. And decoration of the offer, not only the number but also depends on the contents inside, the materials used in this project, descriptions, brands and so on. You know, the decoration of each offer, in fact,Nike Shox Turbo, are of great tension.


121, the construction? Since I am in not hurry to move in, so maneuver to find haphazard workers: the neighbors a agreeable family please artisan, may be I look in the object: a mason, a woodworker, a plumber, a painter. Design tread by step step by step, I trust it slowly and deliberately.

122, to use every penny wisely: look at the decoration materials, they must be dazzled look, there are so many good things, and it seems every one looks the same, the economy can withstand . May be a short period of time necessary to purchase these things in place, the economy pressure is really big. Most people at this time is often in disorder, the result too much over budget the last one, the second is to buy good quality stuff at the United States, then buy something is uneven.
My view is:
one pre-determined price, after the co-optation materials.
excess of the expected price of 10 percent-of material goods, do no waste time. Business customers all nice too. I am doing a detailed schedule of materials needed in the hereafter blog post will be posted for your reference.
Second, province to province, the spent flowers.
the most priceless place is carpentry, pantry cabinets.
most prone to water quality problem areas are became, kitchen water.

123, the cost of furniture than to buy some furniture. 500-700 yuan per square meter general furniture.

124, covert project was not the most important place to save money: water circle transformation, water handling.
way to do is to ask B & Q, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per meter of $ 40 per meter circuit is $ 20 for half a year warranty. B & Q on the first floor in the east of the detailed individual services and offer publication, we do reference

125,, the easiest way is to use online resources to collect, retain, achievement the integration, the future will be put to large use.

126, in order to save time, improve efficiency, decoration materials on the mall each have a harvest, a detailed and practical procurement schedule and allowance is important.
Program list by room species purchase is easier to implement: each took to the streets to see things the same room, to facilitate comparison and comprehensive
together, probable to have success.
one hall project
Second, the living room project
Third, the restaurant project
four master bedroom project
five children
six housing projects, learn projects
seven main Health Project
8, 9 passenger Health Project
kitchen project
ten, balcony engineering
XI Yin Taiwan project
are listed in the plan to put my own post like the following table, for reference: data in the table as an sample.
This list is more convenient for acquisition planning, pre-construction projects may be appropriate, by job re-classification of the combination, into masonry, carpentry, electricity, water, paint and other re-watch. The right side of the table can also be added in the If (three batches of three wall paint brush; shoe with Albert panel, brush polyurethane varnish), etc.

127, home cinema rear spokesmen, the sound to be embedded wires in the living room below, this is very important!

128, add a sink on the terrace, decorated to embedded pipes. Balcony sink is very important, gardening, rinsing hands.

129, toilet, kitchen need background music, sound audio wires embedded before the renovation.

130, both sides must be left socket on the balcony, hanging lanterns, when the New Year, good power.


1: the bathroom is divided into wet and dry region 2 wet areas of the floor drain on the better
2: If you flame natural gas water heater attention to the bathroom to have adequate ventilation settings
3 - 4: If you do not know, then you can ask a professional friend to companion the master now lie more.
11: hydropower, or find professionals to help themselves because the functions in this respect he is to inform those who design their own needs to be transformed in the transformation of migration, but if there are problems when the house until you have installed the
line problems and have to re-do the demolition of the wall is a very big head thing.
12: toilet water to depend on their choice to tile bathroom floor tile is a professional waterproofing has to do this at time of purchase, but you can rest assured water to do well because of chart problems in the choice of size If you encounter after the designers got the mind he would not cut off the bricks to fill the ground so that you demolished the incipient chart of good waterproofing, floor tiles, floor tiles are of course so early you can find out, but not your home is to live for decades we need a long-term certify so you must pay attention to the devise of the bricks in the sidewalk without being broke
19 when the composition is now bought ready-made cabinets are the most direct is because the family The water issues need to be near to establish the design, of course designers in addition to water designed to inform the designer must decide their own homes who are often under the kitchen cabinet so to better determine the scale so that when you cook at home more comfortable with the cabinet panel recommended to choose such a large load to bear safe



white cement tile grouts and method is not the same, but the masons are usually filled with white cement tile grout filling method, so epoch, gone sealant, sealant, and a little bit better to be pointing to the wall instead of doing the paste. Also, the cabinet hinge, pond water, so use a good switch, while the cabinet fabrics, pool compartment body, bolt can be used in general, of course, if you will not care about the money.
If not a big package, I suggest to buy creating materials as much as possible to homes in the East, was home, B & Q and other places to buy can be returned.
131, at the entrance to the light switch, it is recommended to use sensor-based. Black day to go home, save the black.


132, shows a elementary construction, water, electricity transformation
(a) the construction group on the water before entering the construction of a minute test, before they are allowed to alteration tubes.) and can beat down the plaster layer, load-bearing walls for installation on the
(c) in the buried line pipe Such as the need to change the original line, and can not use
(d) circuit to be buried in the dark wall of the best
(e) strong cordless
(f)



133, waterproof
(a) kitchen, Wei
(b) 30 cm from the wall to do it double, more than 30 cm can do it again, coat need water by the door pocket door.
(c) waterproof finish to be dry, a Redo waterproof layer. Where leakage is most likely to


134, tile
(a) in the culling of tile owners of tile required for quality finds its way: first look at its color is uniform, non-variegated black specks and holes the line; followed depends on whether the standard of its size, the amount of tiles with the tape measure the length and width, measure the size of the trademarks to its plant the same size, then the amount of its crooked tile, such as diagonal line, the tile is positive; then depends on the flatness of the tile, the most simple and efficient method is to tile the same brand of two overlapping positive and negative, such as two stacked significant gap between the tiles or you can turn the tiles irregular; last look There is no color tiles, and is out a few samples of the same type of tile, compared in the light, such as do not see color differences can be ordered.
(b) After the paste can not have a whole piece of brick tile hollowing (partial hollowing the all piece of brick can not exceed 20 percent), if the entire piece of brick hollowing be rectified, under natural circumstances, posted 100 per brick, brick wall tiles are allowed to have a hollowing, to allow two brick tile is hollowing, but must rework, rework the main material (yet counted in the wastage of) from them, such as Over this scope, the main material from the construction side is responsible.
(c) Normally, the level of tile degree of error of 2 mm is allowed, the gap be the same tiles, bricks and tiles should be flat on the corner (allowed error of 0.5 mm), kitchen, wall tiles in addition to health bricks and tiles should be flat on the corner, the need to level degrees (allow 1 mm tolerance) and perpendicular (allowing 2 mm error) to achieve, bathroom, balcony to the floor drain tile should be considered, you must first put away the slope, if there is no special reasons, there is water.
(d) in the wall and floor tile Puwan required after the


135, anti-termite
(a) and finish the wall after garbage collection trough, a comprehensive anti-termite (ie, whole-house spraying of termite drugs)
(b ) After entering all the plates in need of anti-termite treatment (specifically for anti-termite wood like to do)
(c) before the need to shop for wood flooring wood floor to shop floor to do a termite treatment
(d) termites spray to wet the drug is better (you can clearly see the wet)


136, the computer is also a design study, and now the computer has multiple functions to set the decimal point, making computing time will have different standards, so we need to bring a calculator yourself, there are now calculated on a cell phone functions, but function is not necessarily good.


137, to prepare their own two good neutral glass, plastic (1 clear, 1 white), recommended the U.S. General Electric Company, B & Q for marketing, 49 a. In the installed bath room, sink, cabinets, security doors when they need it. While the general factory installation package will come with glass, plastic, glass plastic, but most of them penniless quality, the future is easy to change color or moldy.


138, if it were not for a last resort, do not use toilet seat shifter. This matter is very likely to cause clogging toilet bowl water.


139, kitchen Lvkou Ban, hood altitude two, a good hole must be entirely installed so hood up after security. An up my family's early and afterward time and clear the hood to install, disassemble dismantling equipment, workers are busy in out of fashion, has convert a seamless dome ceiling of the suture.


140, if in order to unify charm, kitchen and bathroom doors are installed, and that soon after installed in the door apparent with ground glass joints where glue. I do not have time for the processing, water workers are not thoughtful, a lot of water splashed on the floor bleeding to the door frame, the following part of it has little black (mold) of the.


141, must be tiled balcony! King balcony to angle around to shop, shop to live with the railing to the balcony with the high. My family view balcony to balcony wall angle and the life is not paved,Nike Shox Norge, but to prepare a bucket of appearance wall, they periodically refresh ... ...


142, sealed in the wall before the water reform must allow the main to invest detailed decoration water chart.


143, as if ready to brush the wall color, the transformation in the power line when necessary to take into account for the problem. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the whole line, but wiring. This wiring must be installed where the whiteboard for future upkeep. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~


144, which is the lowest level I made an error, I imagine that the 1.5 m bed width is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside lamps to stay well back of the wall socket. As a result, there is no socket to be blocking the way to use.


145, started before the captain to make analysis of the wall decoration how to deal with the need to spade out all the original abrasive. In particular, ready to paint the wall engineering companies outsourcing to students. My home is narrow-minded out to paint companies, such as carpentry finished painting the walls look gray to know the original is bad, it is best to spade out the whole re-Pihui. However, woodworking has been done, to shovel the ash out of the original bad operation. Finally had to brush the surface of a layer of glue Pihui 108.


146, mushroom the line will certainly be re-wiring. But from the nearest terminal branch wiring. The increase is not allowed in the original wire connector on the wiring.


147, air-conditioning control switch only in the power supply side. Added line on the road is not allowed.


148, change the situation of phone and network lines, they can out of the original fabric of the line to continue to use. However, if the unfit construction there will be many invisible dangers. So it is best to box from the room for weak lines.


149,Nike Shox Sko, the transformation of the workload dimension circuit, generally in accordance with the wiring in three different ways were measured.
(1) play slot pipe (measured by the length of trunking, if a tank more root waterway, according to the number one half pipe the other half included in the on the head of line).
(2) overhead line (wearing tube not play slots), calculated according to the length of pipe.
(3) for cable, according to how much even now the number of replaced (replaced the line to tell the construction team do not throw).
(4) weak transformation, according to the first method. The difference is who is to pay attention to weak-line purchase. Owners will have to buy fewer wire prices.


150, firm the toilet to the floor, hit the screw with it? There is assembly at the base and the pipe, to buy what were sealed and the outside is better: the toilet is fixed with the expansion screw. The interface between the bottom and the pipe at the inside with a special sealant toilet. + Out of white plastic with white cement slurry deployment. When the toilet is generally purchased with a special sealant.



151, buy the materials themselves must 1st reckon the near amount. To buy water when the material to do the latter anyhow, thinking about drawing with the sea draft in the end how much material came out, so what mini trust the boss, the result was base to buy water 5 meters, the substantial use 27 copper head 1, actually bought a 40, should the remaining 13, seven short of the tangible remaining 6. Under repeated questioning from other sites back up foreman Detailed measurements of the pre-circuit their own material, the calculated results and after comparing the foreman of the requirements: from 30 m to 12 cable meters, network cable from 20 m to 13 m, other issues such for insulating tape, plug both large way was I correct ... ...


152, if the old water pipes under the ground, in addition to the drip when the switch is often damaged, do not hesitate to be laying a new, do not save, to assure safety .


153, the variety of retraction on the bathroom walls, the glove do not waste space, and posted a very good very nice tile. Of course, tile alignment that trouble to say


154, sun angle tile lines do not use the income side, 45-degree angle to grind bricklayer splicing was beautiful, of course, you do not choose Tijuana workers inactive way to do things.


155, aluminum pipe, when installed must be sealed cement employees beneath the supervision of the construction standards to allow expansion space for peppery water pipes. Short plastic tube not closed strong, and lax some of the good thing.


156, hall bathroom on the ground if the percentage is high, the transition can be used to solve the door stone.


157, and move the sewer pipe mouth, then in the new and antique sewer pipes should be checked before the entry of the antique sewer butt is smooth, this time a lot of money to clear the morsel to shirk future difficulty.


158, Lvkou Ban did not need to buy high-priced, very cheap Lvkou Ban the effect has been distant better than PVC, the more money I can not see significantly different results .


159, buy Lvkou Ban particular attention to the keel and not Lvkou itself (Lvkou goal is not easy to tamper too much), routinely on the keel complete specter.


160, brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to achieve satisfactory results. This is indeed the bricklayer himself put forward good suggestions.



161, under the supervision of the ground water offensive to use my bricklayer but not directly in accordance with requirements of throwing on the ground, it can even do! It is not the best yourself, do not perturb but assured.


162, the incline of the bathroom floor before tiling to consider the good, the incline is not in consensus with national standard to attain the effect of fast drainage, and if you use a deodorant or a thin floor drain floor drain will be greatly increased drainage problems. Some people say that steep tilt and beautiful, I think it is rubbish. On the opposed larger slope water to speedily run a clean is a very activating thing.


163, platinum-point doors blaze with the LG plate, the effect is good, but if we might consider fitting tailor-made achieved door. Hand-made door is not fine, for reference only.


164, sink a large market brand-name price is not cheap, brand-name quality lunatic bad.


165, the balcony door is best to use the same type of fire board. Balcony environment is bad.


166, bathroom vanities to do when the first cabinet to consider the size of the basin so that the future good eligible.


167, the glass is heavy stuff, the best buy in the proximity, or Be ready to transport methods.


168, install the lock bolt head to pay attention to some wax, wax on and then breaking too late. If you do not cigarette, then also pay attention to the door handle to prevent wall damage.


169, matte paint is pretty high and light, do not listen to the painter, and if a bad brush matte painter said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not fool your


170, with insulating tape and raw materials do not buy in the store, large supermarket quality was much better, and full heaviness, conversion down the price is not expensive.



171, if the re-decoration will be used instead of talc putty finished, no big reason is that finished product easy to use putty. Fired the painter, especially after his own experience when diy - talc intonation putty sick of it.


172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original will want to save wages outside the old junction box use, recommendations on the interior to get a new electrician, he now found it very valuable proposals. On the interior door is not ugly, it really easy to use!


173, large internal design company directly to personnel on site clearance work package may be more suitable, and better technology, tools, more


174, and air leakage protection switch to use the brand label. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone digit, and then played to query the local branch number.


175, the spectators slight pots boils than on stage, agreeable, good cleaning.


176, basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leading to the mouth longer.


177, the hole before installing the toilet is a huge, large floor drain cover can fall off, if your floor drain has been installed and the toilet is not installed, do pay attention to the floor drain cover, or the floor drain cover it up somewhere custody 也好.


178, buy silicone, then the utter best all imports of GE, GE followed by Shanghai packaging. Of course, if the kind of place in a very important unit 7,8 can also be used, case in point, aluminum window frames with internal Anjiu levels of silica waste to plug the whole. But use the bathroom all the GE silicone kitchen, merit for money!


179, triangle valve should not be neglected, and save much money, if the valve, then triangle, triangle valve can be installed in advance of copper joints are not dripping, if only installed, only the last copper fittings installed on the faucet to take over the child when it was installed to check whether the internal leakage, the aggregate leakage deserving to pressure some time to test out the final installation of internal and leading it more safe.


180, even the diary has been renewed to do about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the realization of your ideas, to depend on them.




181, fitting the biggest problem is communication!


182, is not the place, type of kitchen cabinet door designed, BH. Should be designed L-shaped.


183, general decoration, decoration companies, excluding the formal management fees, taxes, fees accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.


184, in the kitchen to go outside the ground water, since home improvement is to give a time bomb, who state clearly whether Shashi Hou for his trouble.


185, if the separate tube wear, but in a tank, the impact it? Effects can endure


186, ask what between the dining and living room separated by the most cost-effective package door pockets, side bag only 6 cm or contaminated with white, altitude 2 m is not significantly large High raw.


187, respectively, to mighty and feeble electrical displacement pipe, can be separated away the best, keep the distance 10 cm or more, but it can be difficult, because most families to save money and open a slot. Weak sound the same line can perforate the tube.


188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and windows at home, only to non-pungent odor. In fact, you are using a good wood core board, do not deal with furniture inside.


189, PCT board and the cabinet can be wood core board 15, the back of the 5 accessible folders, Wuli. Package doors and Tizi use nine per penny. Different processes with different materials.


190, PPR pipe not only for cold water pipes, also applies to hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tube together, so once installed pressure test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never oxidize, never leaks, high water of green materials.


191, paint board is good, the conveniences of both wood and composite.


192, do not publish for a long time on the watery artificial stone, unless you want to dry a typography chart; not take long watery cutting board on the table. Wood rainy occasionally fade; rub the stain with a steel ball, like hand squeeze pimples.


193, can use an ordinary gas measure sideboard gate sealed in it? Need apt use the shutter-type gate it? Regularly check the ventilation prologue on the line.


194, clear contracting the tx Please memorandum that you must validate the renovation team to open a account of materials. There may be certain about their estimates, I too believe that they, and the results to buy wire and cable management about doubled.


195, the size of certain planned sanitary ware, the best sketch in advance, calculate the size.


196, buy the product the students pay attention to the door, if you want to chase results matching panel with a commerce package Door, then you may have to be Henzai sword it!


197, Re: installation of water pipes before they take the leadership and basin, sink have bought?
not, just make sure where is the basin faucet, bathtub faucet, washing machine what's on the line guiding, leading 99 percent sign and fell into the water are in line with worldwide norms, at the peak of workers are not reckless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. Determine the amount of units in front of the sink a good size, front loading station to buy Haojiu Xing, do not forget the audience or on stage. Distance between hot and chilly water pipes with cement tiles must be sealed before the 15 cm accuracy, and must be collateral. If you have bought, it is best put something, such as sealed after the discharge.


198, if an 8-core cable at the same time take the call and network, will not mediate with each other it? Not. 1,2,3,6 hit the cable module, 4, 5 playing on the phone module, and the other 2 easily. Right in saying that my experience: 10M 1236 100M to be accustomed with the truth that the speed to 10/100M that we will not feel any feud if using a 8pin line, then some program-controlled switches marking will cause the network marking interference in the home environment generally will not have any problem. But repose ensured that I can suggest such a separate path to the future, depart margin, cable is very cheap you say?


199, check the distribution box must be properly installed.


200, fitted bath and shower faucet lesson taps joined to the tube is embedded in the wall, I have again told them to get accurate measurements, do not install when the time is not on. The results left the hot and cold water spacing is 15 cm, can be hot and cold water pipes are not parallel, the results of the water feeding the electrical charge of the force was the nestle. Yesterday I found that fb GROHE thermostatic mixer coating even be forced cracked. We can be installed if the actuator, the first installed it. Should be the first leader to buy back, and then install hot and cold water, tiled bar. Oujia bought a very early lead, is Oujia main to buy.
  Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 07:32 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum