Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Auto Surf Traffic Exchanges

Auto Surf Traffic Exchanges This is a list of Auto Surf sites where you can get your site viewed by thousands of people a day. These are not Paid-to-Surf sites, those are listed in the classified's section. These are for traffic building only.

Reply
 
Thread Tools Search this Thread Display Modes
Old 05-21-2011, 04:03 PM   #1
tbmj9153a
 
Posts: n/a
Default 200 elaboration tips ( marital , nomaritaled have

1, the partition will not be the first shoe, leaving a little space so that the shoes can leak into the base ash, sink and gas stove altitude mounted lights. Given the location of the bathroom floor drain must first calculate well, a good amount of size. To drain the best side in the brick, if the bricks in the middle of it, no matter how kind of tilted blocks, floor drain will not be the lowest point.

2, bathroom, air conditioning, no outlet design switches. Especially the bathroom water heater to a couple of level switch with a plug appropriate. To off to electric, pull the plug perilous

3, on the brick part of the treatment of sun angle, the final thinking is to look at the workers class. If the level of good personnel, plasterers, and better tools for grinding ceramic tile, they ought not hesitate to choose the practice of grinding a 45 degree angle. In effect, at all times a good grinding, grinding angle of 45 degrees in the assured approach is the most beautiful! If the level of the workers do much, then you still choose to be positive angle, because the bad grinding angle of 45 degrees angle of approach is not as yang effect of treatise.

4, line up the pipes after the water oppression test is also very important. Test, we must be present, and the test for at least 30 minutes or more, conditions permit, rather an hour. 10 kg of oppression, without any reduction before the final test.

5, when the steel doors steel door must be considered a good size wall frame protruding inform the installer, production the final frame and affixed to the wall tiles are flat finish, so not only beautiful, and good health to do.

6, carpenters and masons of the package Door tiling is to knot in, including door pocket of the time, to consider the following ground (the ground side of the door either side) is also affixed to ceramic tiles or other cement mortar thing, because if you stick tiles Mentao well before the nail has been package to the ground, with cement when the future, if the cement and Door stained, moldy water will cause wood Door

7, under the bed and the bed board must be breathable. Bed board is best for general use cedar board

8, do the paint as much as periodical tape

9, purchase a lamp to note: General tried to use cup, stainless steel, copper or lumber (shelf), and generally do not buy anybody other coatings plated steel on, ah, ah nobody like paint, effortless to fade.

10, washbasin as ceramic pots, glass pots downright Health

11, water and electricity to its own transformation plan, and ask them to open Cao straight line. Watching them paint their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.

12, water must be good, be sure to test the water!

13, many of the construction of a verbal accession into the gap checkout massacred, must be written in black and white, a change in the project are sure to ask what the price, write it!

14, ground floor, if installed, to re-do all the ground re-smooth layer of cement.

15, the kitchen door, or to make a wooden decoration hanging rail wood doors for good.

16, the living room as much as possible to setup the power plug.

17, is still to be done outside the bathroom shower partition. A shower shutter can not pull the easy way wrong, real inconvenient, water everywhere.

18, do door and frame substances to choose fine grained matters.

19, before installing the cabinets must be sure your home water is OK.

20, kitchen layer tiles ambition not pick pearly.


21, ceiling, pay special attention to smooth putty before wiping Dulux

22, the number of living room lighting should not be too light, easy is better, or like the lighting shop!

23,Lacoste Swerve Lace Trainers, to buy things that need to be installed as the installation requirements of peddlers, it does not embody installation, it must cling to only pay the full paragraph after the installation! !

24, the renovation period, before you collect from business card manufacturers carry

25, Lvkou Ban the protective movie is best removed before installation.

26, shoe is best to use shutter doors, deodorant. Edges can leave a shoe outlet, to plug drying shoes.

27, cutting and a small safe place to light.

28, it is convenient restaurant exhaust flare can also be safe, so when you dine peppery pot or do not filthy grill houses the Office of the ceiling.

29, the door is best to prepare a place debris in the cabinet, can be placed on top of shoe. The mutual asset, such as umbrellas, bags, scissors, change, eat the medicine, and so on there, so it is convenient.
30, there is no need to use your dome, if only too worried almost moisture and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, my health to do a visitor, very beauteous. If you must use Lvkou Ban smallpox, it is recommended:
1, not too expensive.
2, using the net color, especially in the kitchen ceiling, white on the good, the color white unless and decoration style match, it will easily inconsistent.
3, download their own ideas, do not believe selling the vision of smallpox, their vision was widely taint.
4, staring at himself in the scene, closing side is very important, do not let them lax, or depart a black seam, how to look how hideous.

31, the third day and continued to stick largely perforated tiles, range hood, and water heaters to pre vent arrange, and if so then perforated tiles stick better, not easier. Therefore, before the renovation must be elected in the scope hoods, stoves and water heaters, to determine the size of punch.

32, although taking into account the custom-made cabinets look good, but not durable, comprehensive views of some of my classmates online and experience, to counter the structure of using cement to do, inside and outside the sides stick tiles, marble countertop shop, wall cabinet and cabinet wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And spent another few. Read a good many of his neighbors say, I did not beat.

33, well after the door pocket, plasterers plaster line to begin the installation, wall Pihui works. Comparison of the wall of my house was originally fashioned, ratified 2-3 road on it. Pihui acknowledged when a gray polished once, and then brush the handbook, sanding afresh, after brushing, and finally twice with ICI paint brush, the all wall looks smooth and flat, really good. Upon completion of the ceiling wall, a carpenter started wardrobe. Albert wardrobe is 18cm's authorize Daixinban do paste veneer outside, however there is no furniture store to buy so good-looking, but durable, quality should be better than to buy. I'm not terrified of standing container board. I am terrified that is not enough to buy. Backplane is relatively thick, buying is thin.

34, other students in the tiling must pay attention to the following points:
① best he can in the scene.
② some less than perfect tile can additional in the future some workers do not see the location, such as cabinets, sinks, mirrors back, but also pay attention to tile, brick, etc. Do not waist is more than the workers attached to the position, otherwise You can not see everything in the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the flood damage must be enough time.
④ sure to floor drain plug with something good out of cement down to discourage clogging. My family just because off the cement floor drain is blocked, and spent 30 looking for the management bureau to clear, get up a lot of small mud.
⑤ people at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of bricks, it is the heartache, all the blood and sweat Mimi Yeah.

35, a wall of long, high. Such as a bathroom with four walls, each wall should measure out of its long, high. And then discount one of the windows and doors of the area. Finally, a mathematical ground space. After the size of the amount you can also get a sub shop selling tiles, they will help you re-match. Loss of 5 percent-plus on the line.

36, the best is a two bedroom dome light control, and a door, a bed, lying on the bed save the winter and then it turn off the light.

37, the socket must be considered a good place, height, interval. Even first met playing steel cassette rank, the latter is found to equitable be put away the magazine TV cabinet, microwave ovens, desks stop, had to shake the location of the premier two high furniture, and finally found not only ergonomic height, but also can not buy a good eligible stainless steel cabinet legs, can only be made of aluminum foot.

38, just around the corner in the hallway of the tube with a good, shine and have that effect.

39, did no take into account when loading the chart lamp nestle, it lights not in the medium of the table.

40, bathroom tiles do not use too much dye, one easily dirty, and second, a long time, too dim!


41, outlet to more equipment, furniture to buy outside the ground to dirt security to consider, like to see more housing, in rule, should adhere to.

42, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see significantly different results. Buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.

43, the color of brick is hard to find satisfactory, and I did not find, although, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is absolutely the bricklayer himself put along good proposals.

44, on the balcony on the top cabinet, then hit the back of the cabinet with a layer of waterproof insulation bubble board works well. Balcony door is best to use the same type of fire board. Balcony environment is harsher.

45, if no suitable molding may hope to custom, custom quality seems better than the example also. More personalized and customized.

46, bathroom cabinets with stainless steel legs are huge profits to find some local stores to buy back price of mad cheap.

47, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid harm to wall.

48, Paco the floor well, I like to remind that the only directly to the boss about the price and the seller talk about than the price better.

49, matte painting is beautiful than the high light

50, if the re-decoration will use putty instead of talc productions.

51, installation and air leakage protection switch coalition carton of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction carton outside use, electrical proposals put fashionable ones in the room, and as long ashe recommended this expensive.

52, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, straight call MGE investigation headquarters phone number and called to ask the local branch number.

53, the crowd slight kettles kettles than aboard stage, agreeable, good cleaning. Basin mixer with the crowd to disburse consideration, catching into account the basin brim thickness, guiding to longer mouth.

54, without any revision of the wall angle is also very beautiful, but to advance the stage of looking for the painter and the painter clearly put forward. angle Ding Jiaoxian do help to play the straight line.

55, online slots before the cement surface, surface treatment approved putty is very important, for no solid surface with a clean ball handling is very appropriate.

56, make plaster suitable for a large hole on the wall, of course, if the hole is too big or need to use cement.

57, frosted glass on the back do not coated with paint to protect the hard to clean!

58, Caipen actuator can be sure to alternate behind of the hand, that must be not easy to keep clean fingers, hand turn up when the oil is also difficult.

59, the price of luxury auto racks too much water, and found a number of relatively unknown brand in the structural design on the front line rather than the brand, the price is much lower.

60, could be considered safe on the ground of the metal socket, this socket 100 is very expensive, but very convenient, usually flush with the ground, the foot can plug a foot to popup up. Suitable for large living room. Or on a dining room table, below, is used to insert hot pot (to prevent hanging back and forth when moving wires)


61, storage room. TX has been said, but I did not do doors, looks very beautiful and easy to put dirty clothes in the cupboard.

62, starting bed frame (which is so called up.) I am a professional company to buy the cloth-bed bed, and spent 350 yuan added such a thing, end of the bed there is a pull handle, the bed board will be turned up, exposing the bottom of the storage space, what a great Oh!

63, is not practical double bar towel rack! Like the present and uses a single wand, hanging rod found floor will not look inside and then drying towels

64, inside the cupboard that the trash is not enough practical,Lacoste Camden Trainers, than on the outside. There do not install the door panel of the trash bin and table, open the door when the summer will be very smelly. Trash or on the outside good.

65, the table next to the small cabinet, and can be placed on some stuff, very convenient.

66, to I think the mop bucket less demanding in terms of performance, one can assemble themselves out of covered and the circling environment that is consistent with tile or mosaic appearance, and money.

67, the bathroom can point fasten hook to hang something in the hook.

68, designed a bathroom cupboard put clothes, no longer must worry about bathing forgot to clean clothes.

69, washing machines with drying is not serious and practical, in addition to one year, only the yellow mold-day, and the malign mammoth. Thick clothes, towels or drying discontinue, let the sun consumer disinfection to be good. Even overdrawn, you need to save the point of silver.
70, even in the laundromat room to do a laundry pail, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundry tub, became my most frequently used a washing area. What rag ah, ah socks, and towels, ah, all washed in it, and even most hands there too.

71, fitted with lights actually not practical, the decoration done up to now not opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under phantasmal, and now do not have much opportunity of beginning blot.

72, the biggest course learned is that in fact the simpler the better fitting, less pollution, less money, peace of idea.

73, useful stuff:
① designed warehouse room.
② North Terrace sink used to wash the filth. Differences between the washbasin and toilet and washing vegetables for the kitchen sink.
③ bathroom can be pulled out of the leading shampoo. (TX shampoo basin was never an exception.)
④ easy to clean the floors and the appropriate cleaning tools.
⑤ work lights the kitchen table.

74, buy a toilet must be a good amount of their own pitch, or go buy a return that is really ... ...

75,Lacoste Running Trainers, Bath and Kitchen floor tiles mallet better after a good amount of what the former did not do the level of the lowest point is not looking at the floor drain, or other teams did and decoration after passing, a lot of die cells.

76, window beads Angeles with the Great Wall of stone tiles is a 800X800. Manufacturers cut and edging, Mason posted. Pattern did not look good also
radiation.

77, bathroom shower room must be large enough size, and use perspicuous glass, shower in it will not appear so cramped.

78, should not use white cement tiles pointing hook. Did not become a black month gap, ugly necrosis. The results they have bought their own hook pointing proxy, that tired

79, the cabinet should be pad under the artificial stone after the board, with the result that there is no installation, it can not cut the pork in the above, agreed to give me almost two months have not installed installed (only to slick once).
80, do not jumble the letter designer. Of course, you can visit several decoration companies and more, from the design in each extract something really useful, the key is what you want to primp like home improvement.


81, if the floor drain has been installed by the original developers that hinder foul of the

82, bathroom tiles affixed to the floor behind a good test the water, if water is relatively slow to rework now. Our household's water is relatively slow, then relented a morsel, it was forever a little bath water, and made hundreds of our main Guardian have idle money in the shower pate, and marvel how the absolute now relief.

83, fitted bathe basin and mirror to be considered good, put brush glass shelf, towel rack relative position.

84, bought the mirror to consider the position of mirror front lamps, and if do not want to install a temporary mirror front lamps, mirrors the size of the cover for the mirror to be able to set alongside the line of the best light.

85, put washing on the balcony to be a small cabinet, easy to put some debris, such as washing abrasive within the debris. Both beautiful and practical

86, must be staring at the upstairs upstairs to do down the dripping water .... otherwise, get the wall cabinet, the wall is a mess ....

87, do not blindly follow the online buy, I later found that some themselves to buy cheaper than the sale.

88, TV backdrop will set up a few more outlets, TV, DVD .... a put, you will find enough outlets.

89, change the water well in the future to be considered before loading in the wash basin in the bulk sample, for example, the left or right pots pots, water and drainage that is located in what place. Otherwise, changing for the better after the breakthrough phase of the wash basin was not fit!

90, on the curtains, we had better put your stay a size goes, the boss can not be less that size. If less, then, how how the. Or saw him cut his cloth.

91, the elaboration of the construction process:
(1) approach, wrecking down a wall.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this mission.)
(3) cutting trough,Buy Lacoste, water, electricity transformation and acceptance.
(4) sealed underground water secluded trough renovation project without closing the water leakage test started waterproofing.
(5) bathroom, kitchens wall disk.
(6) Carpentry approach, suspended ceilings, plaster moldings.
(7) archives Door, window cover. Making wooden cabinet frame.
(8) simultaneous production of wooden doors, plastic doors and even pressure.
(9) wooden panel paint brush dust (food vegetable oil).
(10) leveling the table laying marble windowsill.
(11) wood trim panel, pasted, fine line production and installation.
(12) wall primary treatment, grinding, leveling.
(13) belongings, the door seams paste stickers (defended side).
(14) ICI oil for at least 3 times the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, skirting.
(17) lighting, sanitary ware, handle, gate latch installation.
(18) clean up, floor tiles make up joints, dismantling.
(19) decoration preliminary acceptance within the company.
(20) three prim acceptance of meeting, delivery landlords.

92, flue gas valve back together, be sure to clean and ensure the valve can switch freely and to able to open to the most, otherwise it will affect the effect of cloud hood. To remain in the installation of two ceiling is not installed, so hood and try and correct installation of the ceiling and then installed.

93, so much in the living room and dining room ceiling can not do not do it.

94, good air conditioning in order to take the line position, the power closer to the air conditioning as much as possible, so install air conditioning power cord to see part of it, leaving a track of regret.

95, to personally weigh and record entire the available house sizes, size chart will be covered 楼书 units and then re-wire tagging, the last size will directly affect the interior design and furniture purchases.

96, line a bad alternative if small size of the dark walnut is always ample atmosphere, then need to have alternative, or to accommodate actual or accompanied their own ideas, of course, be both the best

97, began looking for decorators. To private experience is cared, if it were not for particularly large size and intended to simple decoration, it seems more cost-effective to find some of the guerrillas. After installation it is best to introduce people, you have peruse and coincide to the eyes, especially the sensibility of the person in dictate of the decoration is more important, responsibility and appreciation of how, some of the sometime is more critical, because if it were not for a stripped-down, in fact, those who live about on the outdoor will do merge, but the quality is good or bad may depend on a sense of responsibility.

98,New Lacoste Trainers High Top, the main furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. had better take a look for advance, if the scampering around on the weary, you can find a few good large-scale home shopping plaza shopping, the elementary trend to see it, so the next thing you do is based on their lusted style filter out the right things slowly. Some people take good style, meantime others grip of color criteria, it does not matter, anyway, there is time to consider, if you wait until clearance decoration, furniture, help wanted steps to go in the final will reluctantly approve the inevitable and not very much.

99, has been bullish on the furniture is best to size down, and then to exhibit the future situation of the virtual room.

100, the necessary documents to buy something good must be preserved, a move that may exist on the post-retirement, a replacement will definitely benefit. In particular, some important items of the store receipts, leaflets, etc., because a lot of things have a engagement phase, the evidence lost would be more trouble.


101, during the construction projects are sure to boost or decrease the price they inquired for and then write it in black and white.

102, check whether the construction is needful protective measures, such as entry doors to use pearl cotton mantle, a good window and floor tiling also proper protection.

103, as many as feasible to communicate with construction employees, to determine if he understands your purposes. Put ourselves in each esteem the work of the main, respect him, and folk feel the importance of family, and began to live to if it is more responsible for some of it? Saying works, is not phoned (But if you face a treacherous cunning bully, who, it would have to retaliate, dispute) in particular to some marginal projects is the need as co-ordination of several trades, the workmen will be responsible to each other and coordinate their respective duties, Otherwise, we pass the money back and along, all pass the money. Like my mason to aid me solve some carpentry object, and electrical and determined some masonry problems. Because each teacher's experience is assorted, at the peak of he is willing to assist you find a way.

104, do not do the best furniture nailed, because it no longer may be some changes in the layout. If we do have to grasp the quality, or infinite trouble.

105, be sure to change the water carefully, one charge of money; Secondly, if you do not need from the floor to the ceiling laid down water pipes, water pipes in case of a problem to big trouble.

106, according to their tangible needs rational preparations wiring, so as not to garbage (primarily the napkin with a lot of lights and lighting if only practical, we must also attempt to lest tandem use, waste electricity), but some places can not be Province, for example, next to the bathroom mirror, hairdryer and shaver to constantly; well inside or beneath whether the boot has a socket is good, can roast shoe device, I now apologize not quite this cable napkin.

107, the bathroom as wet and dry area, if area is small with a base like (special glass basin was dirty, lazy with caution); conditionally set a waterproof cabinet incorporating small debris is best, put anything certainly does not look good on the outside.

108, wood glossy white paint brush when the polyester better than the Nitro (which is to listen to seasoned painters speak.)

109, the cabinet must be cautiously chosen, likened to more than a few quality, we go to do a solid tight, because this 1 is easily thousands of sea, and related to the furnace and sink and so on, so it is still not to indulge in corrupt cheap good. But best not to do in the cabinet table or inside the litter; there is, if funds are limited, basket, basket seasoning, rice bucket of what you can do all of these components in the cabinets sell the company in common is very expensive.

110, wardrobe rather more not less, rather big not small, the women remember! Dangling from the longest space to be capable to clothe down.

111, such as glass or mirrors not handling things the best buy in the neighborhood, or first think of a good means of transport.

112, curtains, furniture, household appliances in the whole approach is best and then made to match the overall style tone. However, before cleaning can pathway installed.

113, gas change management best tiling complete, or there may be damage to the wall. Best to let the gas company to draw a chart or on the wall as a character of the company to be required because of the cabinet body openings in the cabinet.
114, cabinet installatiin due time is longer, anywhere from 4 to 5 hours, or more than 2 days, must be psychologically prepared. Installation can check whether the material is used in the kind of set you (the hinge hole can be seen via the cabinet material). Before installing the kitchen cabinets before cleaning it, because once the installed cabinets, no way those dead ends and then cleaning up.

115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes on the choice, I was not looking at the results of the small distance between the laminates, hang clothing extend not open, even after the adjustment.

116, taking into account the formaldehyde pollution of the environment, such as spider factories can be placed in the green room, furniture doors open all the emission of odor, but also to buy someone special spray to eliminate odors.

117, installation of combustible gas, booking gas ignition.

118, Brush Wood of the time: the best Puwan other rooms painted tiles or wood flooring. If you must brush, the best have to clean the room. No floor tile or wood floor room, the room a lot of dust, then brush Wood, then brush off the dust easily attached to the surface of wood products Wood, feels a tingling feeling, although this can be higher name and then brush again sanding solution, but in the end it feels to feel the brush and the overall effect will be a deduction RBI. Puwan brick room after the brush, when the dust content in the air before the shop a lot less than the basic Wood does not appear again after the dust brush addition on the surface of the wood products. All that being said, because a small renovation to hit the Wu family situation, I had decided to buy in Canada Wood hi seen it before the effect of brush, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of effects to play a lot of discounts, it has been labeled Wu regret things. And I buy in the union hi the process of addition paint, some students appeared in this family. So to caution students to take note of here. Wood I do not know whether the other case, but according to the principle of same reason, so here to remind students to pay attention to it.

119, on the fill paint: painting teacher pay is waiting another batch of finished dry wall putty, putty is dry paint. After brushing paint loaded if no reason is necessary to switch the lamps and various electrical utensils. Ask somebody to install lighting and electrical switches to remind the teachers to pay attention to this and a clean install Sin before hand, so that when installed will not be a dirty wall. Will save a touch-up painting processes the. Of course, tarnished the walls, the decoration is to make sure the paint division teams to pay up painting again, that is, the walls will get dirty clean (if it is paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint department will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint.) Just note, do not let install lighting department to pay soiled walls, paint can make teachers pay less for a tumble (or at least half a day), but also assist a lot of our own, and why not? Sometimes, with people easily, also has been easy. In general, a house painter will paint before brushing the Wood, Wood to do so is to avoid the process of dry brush would paint the walls of the wall clash. Of course, in actual operation, you can also Puwan after tiles (floor tile wall of the putty has been approved before the good) painted Wood, Wood, etc. after whitewashing paint dry, but to do so, of course, will affect the duration. If the alarm of affecting the duration of the case, but also the shock of the air to reduce dust, then point to a lot of diligent to clean the room, the health of the.

120, decoration team choice: As the first company selected the guerrillas or the regular, I think is not important, the key is to give you the head of the construction team is responsible, the technical renovation of the workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than four, a cloud ofis this, if your time is very rich, it is different material. And decoration companies to speak about this before, must be explicit that you have to do renovation projects, you can call the company reported that all the decoration items, compare prices and comprehensive after taking into account the assorted elements and judge what the next items you want to outsource , which items to embroider the company to do.
the decoration of the people, the decoration of the attempt as low as possible, of course, opposed to the views of decoration company. Sometimes the decoration company to La Shengyi, will attempt some of the weight of relatively low, this way, the project quality and the quality of materials is more difficult to certify. Renovation so many, you want to term items are the lowest, it is unrealistic. And the renovation of the offer, you can not just look at mathematics, which also depends on the content of the materials used in this project, specifications, brands and so on. You know, the decoration of each of the quotes are actually quite an art to.


121, the construction? As I am not eager apt reside, it plans to look in casual workers: your neighbors a agreeable family builders are presumable to chance the object of my looking for: a mason, a carpenter, a plumber, a painter. Designed to do tread at tread step by step, I deem, working slowly and accidentally.

122, to use every cent wisely: look at the decoration materials, he must be looking tired, there are so many good things, it seems, like every single look, and economically able to resist . A short period of time to make all these things can be purchased in place, the economy pressure is so big. Most people at this time is often in disorder, the results of the last one too much over budget, the second is the U.S. price of the first things to buy high quality, then buy something is mixed.
My view is:
one pre-determined price, after the plebiscite materials.
excess of the anticipated price of 10 percent-of material merchandise, do not waste time. Business is always fine too consumers. I am act a detailed schedule of materials needed in the future will be posted in the post for your reference.
Second, you could save on the province, the bloom to flower.
the most expensive place is carpentry, kitchen cabinets.
most disposed to water quality problems is the transformation of the place, kitchen and restroom water.

123, the cost of furniture than to buy some furniture. 500-700 yuan per square meter of mediocre furniture.

124, covert project was not to save money the most essential place: the circuit transformation of water, water treatment.
approach is to ask B & Q to do, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per meter 40 yuan, 20 yuan per measure circuit, with six months warranty. Details of B & Q on the first floor in the east of the individual services and pricing announced, we do reference

125, the most hassle free way is to use online resources, the collection, retention, arranging integration, will surely be serviceable when.

126, in order to save time, cultivate efficiency, each has a acquire on the decoration materials market, a careful and practical procurement timetable and budget is very important.
list by room category procurement plan is easier to implement: each took to the avenues to see things the same room, to facilitate comparison and comprehensive
attach, likely to have success.
one hall project
Second, the living room works
three, four cafeterias engineering
, master bedroom project
five or six babies
housing projects, learn projects
VII, the main Health Project
eight, nine passenger
Health Project, the kitchen works
ten, eleven
balcony engineering, engineering
Yin Taiwan is now put my own plans like the table set out in the following post, for reference: file in the table as one example. This list is accustom as a procurement plan
more handy, the corresponding project before construction can be re-classified according to types of combination, into masonry, carpentry, electricity, water, paint and other re-tabulation. The right side of the table can also multiplication If (emulsion paint three batches of three brush; shoe plate by Albert, brush polyurethane varnish) and so on.

127, home theater rear spokesmen, the sound cables to be embedded in the living room below, this is very important!

128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.

129, toilet, kitchen need backdrop music, audio and audio wires embedded before the renovation.

130, both sides must stay on the balcony outlet, Chinese New Year lantern, good power.


1: the bathroom is divided into 2 areas of wet and dry on the wet area floor drain better
2: If you are burning natural gas water heater attention to the bathroom to have adequate ventilation to set
3 - 4: If you do not know if friends can ask a vocational chef, accompanied by the now more than a lie.
11: hydropower is still looking for professionals to help themselves because the functions in this environment also inform the design of their own lives who need to be became in the transformation of migration, but if there are problems when the house until you have installed the
line problems and have to re-do the wall torn down was a very big head thing.
12: waterproof bathroom of their choice should depend on the bathroom floor tile floor tile professionals are there to do this in the buy of water treatment can recess positive that when you do bad, but because the waterproof design problems in the choice of size If you encounter after the designers got the idea that he would not cut off the bricks to fill the ground so that you broke the original measures designed to waterproof tiles tiles of course, this is the early you can find, but not out live in your home is a few decades we need to assure the long-term design, so you must pay attention to the bricks in the sidewalk without creature destroyed
19 when the medley is now bought ready-made cabinets are the most directly is because the family The water issues need to be near to build the chart, of course designers in adding to circle design but also inform the designers set their own homes who are often beneath the pantry cabinets so the scale to better decide your cooking at home more cozy to use page metal cabinet suggested to prefer such a massive load to bear safe



tile sealant and not the same as the use of white cement, but the masons commonly use the usage fill fill white cement tile sealant, so that Time to go on sealant, sealant pointing to a little bit better and not dry the paste to the wall. Also, cabinet hinges, the pool water, switch and so use the good, the cabinet material, pond cell body, pins can be used in general, of course, if you will not care about the money.
large package if necessary, I suggest to buy establishing materials to the eastern as far as possible to their homes, really the home, B & Q to buy such a place can be returned.
131, at the entrance to the light switch, we recommend using inductive type. Black day home, save the dark.


132, note 1 basis construction, water, electricity transformation
(a) before entering the construction troops on the water to minute test, before they are allowed to change management.) and can knock down the plaster layer, load-bearing walls for installation on the
(c) in the buried line of control If the original line to be changed, and can not use
(d) circuit to be buried in the black wall of the best
(e) strong electric
(f)



133, waterproof
(a) kitchen, health,
(b) 30 cm away from the wall to do it twice, more than 30 cm can do it again, wrap need the waterproof door pocket door.
(c) waterproof finish to be dry, the Redo waterproof layer. Most likely the leak is the


134, tile
(a) the owners is required in the culling of tile for tile quality finds its way: first, to see its color is uniform, non-mottled black spots and small holes the line; followed depends on whether the standards of its size, the amount of tiles with a tape measure the length and width, measure out the size of the factory size to be consistent with its trademark, the diagonal and then the amount of the tile, such as the diagonal line, then the tiles is positive; then look at the flatness of the tiles, the most simple and telling method is to tile the same brand of two overlapping positive and negate, such as overlap significantly after the gap between two pieces of tile or you can turn the tiles uneven; last look There is no color tiles, the method is to take out a few samples of the same type of tile, in the light are compared, such as do not see the color difference can be ordered.
(b) After the tiles stick can not have a whole piece of brick hollowing (local hollowing whole piece of brick can not surpass 20 percent sign), if the needs of the entire film Brick hollowing rework normal circumstances, Post 100 per brick, brick wall tiles are allowed to have a hollowing, brick tiles are allowed to have two hollowing, but must rework, rework the main material (already counted in the detriment within) from them, such as Over this range, the main material responsible for the construction.
(c) Under customary circumstances, the level of tile degree of peccadillo tolerance of 2 mm, the gap to be invariable with tiles, bricks and tiles should be smooth on the edge (allowed error of 0.5 mm), kitchen, health and brick wall in addition brick and tiles should be smooth on the corner, the need to level degree (error to allow 1 mm) and vertical (allowing 2 mm error) to achieve, bathroom, balcony tile floor drain should be considered, you must first put away slope, if there is no special reasons may not have water.
(d) in the wall and floor tile Puwan necessary after the


135, anti-termite
(a) hit down the walls and the trough in the waste after, a comprehensive anti-termite (termites sprayed the whole house that pills)
(b ) After the portal of all plates in need of anti-termite treatment (specifically made for wood termite classification)
(c) required before wood floor shop to shop on the ground to do a wood floor termite
(d) termites spray to wet the drug is favored (you can clearly see the wet)


136, the computer is also a research dollars, and now the computer has multiple functions to set the decimal point, making actions will have different standards when, so we need to send a calculator yourself, and now mobile phones have computing capabilities, but the functionality is not good.


137, two better prepare themselves independent glass, plastic (1 clear, 1 white), recommends to the General Electric Company, B & Q for marketing, 49 a. Pretending to bath room, sink, cabinets, security doors when they need it. While the general plant installed archive will come with glass, plastic, glass plastic, but most of them poor quality, easy to alteration color or mold the future.


138, if it were not for a last resort, do not use toilet seat shifter. This material is very threaten to cause clogging toilet bowl water.


139, Lvkou Ban kitchen, two above the hood, open the holes we have to wait a good hood completely up security after installed. An early and I go home, and later removed to install hood Shiyou, separately and put them all out of shape by workers, seamless ceiling has become a ceiling joints.


140, if the intention of uniform appearance, is also fitted kitchen and bathroom doors, and that soon after the installation on the door apparent with the ground glass joints where paste. I do not have time for processing, water workers are not detailed, a lot of water splashed on the ground infiltration to the door frame, the following part of it has been a little black (mold) of the.


141, must be tiled balcony! King balcony to angle nigh to shop, shop to life and railings to the balcony the same elevation. My outlook balcony to balcony wall angle and the life there is no shop, had arranged a bucket of wall paint, refresh yourself on a normal root ... ...


142, sealed in the wall of water reform must allow the decoration to invest detailed master water map.


143, if the paint color for the walls, in the power necessary to take into account the time for transformation of the line problem. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the entire line, but the wiring. This wiring must be installed where the whiteboard for future conservation. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~


144, which is the lowest level I made a blunder, I assumed that 1.5 m bed breadth is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside cabinet to stay well behind the lamp socket on the wall. As a result, there is no way to block the outlet used to be.


145, started before the skipper to make the decoration of the wall how to deal with the need to shovel out all the original powder. In particular, prepared to paint the wall works outsourced to the company's students. My family is narrow-minded out to paint companies, such as woodworking look after painting the walls gray only kas long asit is bad, it is best to shovel out the whole re-Pihui. However, wood has been done, to shovel out the ash is not good the original operation. Finally had to brush the surface of a layer of glue Pihui 108.


146, increase the line must be re-wiring. But the extremity from the nearest branch wiring. The increase is not allowed in the original wire connector wiring.


147, air-conditioning control switch only in the power supply side. Added on the line is not allowed.


148, change the location of tel and network cable, when the original linen of the line can be drawn to continue to use. However, if the unsuitable construction there will be many hidden perils. So the best room of the weak from the box to be replaced.


149, calculation circuit transformation workload is generally in consensus with the wiring in three different ways were measured.
(1) play slot pipe (at trough length measurement, if a tank with multiple basis canals, calculated according to half the number of tubes. The other half included in the overhead lines.)
(2) on the head of line (wearing tube not activity slots), calculated along to the width of pipe.
(3) for wire, according to the number even if the number of replaced (replaced the line to acquaint the construction team do not dart).
(4) weak reform, according to the first method. The difference is who should pay attention to the weak line is purchased. Owners will have less to buy wire prices.


150, how the toilet fixed to the floor, hit the screw with it? There is convergence at the base and pipeline, to buy what were sealed and the outside is better: the toilet was fixed with expansion screws. Convergence at the base and the inside of the pipe with a special sealant toilet. Out of white plastic with white cement + water slurry deployment. When the toilet is generally purchased with a special sealant.



151, buy materials, we must first calculate your resemble method. To buy water when the material to do anyhow, after preoccupied about a painting materials by sea draft in the end how many came out, so little confidence in no time the boss, the result was that buy water 5 meters, the actual use 27 copper published months, actually bought a 40, should the remaining 13, 7 short of the actual remaining 6. Under reiterated questioning of the boss back from the other site Details of their pre-calculated circuit material, the calculated results and after comparing the foreman of the requirements: from 30 m to 12 cable meters, web cable from 20 meters to 13 meters, other such as insulating tape, plug had large way was I correct ... ...


152, if there are old water pipes under the ground, in addition to switch hit, it tends to be damaged, do not hesitate to be the laying of new, do not save, to ensure safety .


153, bathroom walls that retraction of the mitten do not waste space, and posted a very good very fine tile. Of course, that tile association trouble saying


154, do not use tile received positive side of the line angle to 45 degrees splicing bricklayer before grinding beautiful, of course, you do not choose Tijuana workers idle way to do things.


155, aluminum pipe, when installed must be sealed cement workers in the supervision of the construction standards in accordance to the hot water pipe Reserve space for expansion. Short plastic tube not closed strong, and lax some of good thing.


156, the bathroom floor if higher than the hall, the conversion can be used to solve the door stone.


157, and move the sewer pipe mouth, then the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.


158, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see the effect of significantly different .


159, buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.


160, the color of brick is hard to find satisfactory, and I did not find, but the two kinds of color are not satisfied with a staggered mosaic sub can reach 45 degrees but I am very satisfied with the results. This is indeed the bricklayer himself put forward good suggestions.



161, under the supervision of the ground water repellent to use is not in accordance with the requirements of my bricklayer but directly gushed on the ground, it can even do! It is not the best yourself, do not disturb but guaranteed.


162, the slope of the bathroom floor before tiling to consider the good, the slope is not in accordance with national standard to achieve the effect of rapid drainage,Lacoste Prep CB Trainers, and if you use a deodorant or a thin floor drain floor drain will be greatly increased drainage problems. Some people say that soak slope and pretty, I think it is ridiculousness. Instead larger slope water to speedily run a very clean and is very comfortable thing.


163, the LG door with platinum point fire board, the effect is good, but might consider if we made the decoration finished door. The door by hand is not refined, for reference only.


164, sink big mart brand-name amount is not cheap, brand-name quality crazy bad.


165, the terrace door is best to use the same type of launch board. Balcony context is harsher.


166, bathroom vanities and cabinets to do when they must consider the size of basin avoid good fit in the future.


167, the glass is cumbersome stuff, the best buy in the neighborhood, or first think of a good means of transport.


168, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.


169, matte paint is high and light is beautiful, do not hear to the painter, and if only brushed matte painter, said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not lying to you


170, insulating tape and Teflon tape in the store to buy another large supermarket was much better quality, and full weight, conversion down the price is not expensive.



171, if the re-decoration will be used instead of talc putty ended, no big reason is that finished product easy to use putty. Especially after the painter fired when their own experience diy - talc tone putty sick of it.


172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside the use, electrician recommended a new one on the interior, and now thathe suggested this valuable. On the interior door is not bad, it really easy to use!


173, large decorating company directly to the workers on site clearance work may be more appropriate package, and better technology, tools, more


174, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.


175, the audience delicate pots pots than on stage, good-looking, good cleaning.


176, basin faucet with the audience to pay attention, taking into account the basin edge thickness, leading to the mouth longer.


177, the hole in front of the toilet installation is a big, large floor drain cover can fall off, if you have installed the toilet floor drain is not installed, do pay attention to floor drain cover, or the floor drain Ye Hao stopper kept it up somewhere.


178, buy silicone, then the absolute best all imports of GE, GE followed by Shanghai packaging. Of course, if very important place in the 7,8 factor that can also be used, such as aluminum window frames with inner Anjiu levels of silica waste to plug the entire. However, all use the bathroom GE silicone kitchen, amount for money!


179, triangular valves should not be neglected, and save much money, if the words of the triangle valve, triangle valve to be installed in advance of copper joints are not leaking, if necessary installed, then only the last copper fittings installed on the faucet to take over the child when it was installed to check whether the internal leakage, the total leakage to pressure some time to test it, and install internal and less safe if the lead.


180, even in the diary has been renovated to be done about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the realization of your ideas, to rely on them.




181, fitting the biggest problem is communication!


182, little place, kitchen cabinet door type designed, BH. L-type should be designed.


183, general decoration, decoration companies, excluding the formal management fares, tariffs, fees accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.


184, go in the kitchen on the ground outside the pipe, that is, from home correction to a time bomb, who say where Shashi Hou himself in trouble.


185, if the separate tube wear, but in a tank of great? Effects can endure


186, ask what the restaurant and living room are separated between the most cost-effective package Door, side package only 6 cm, or contaminated with white, height 2 m, was not large High crude.


187, mighty and feeble power convey to every tube, to detach the best way, reserve the distance of 10 cm or more, merely it tin be difficult, for most families in mandate to retention prices and to open a slot. Weak audio line can perceive the same pipe.


188, inside furniture, paint and paste board can do a good job and opened the door and ventilation doors and skylights at home, only to not pungent scent. In fact, you are using a good wood gist board, do not deal with furniture inside.


189, the cabinet can be 15 cm plates and wood core board, the back of the five available folders, Wuli. Package doors and Tizi use 9 per cent. Different materials with different techniques.


190, PPR pipe not only for cold water pipes, but also for hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tubes together, so once installed oppression test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, not rust, not leakage, green high water material.


191, paint board is good, the conveniences of either wood and composite.


192, do not publish for a long time on the watery artificial stone, unless you want to dry a typography surface; they should not be long-term watery cutting board on the table. Wet wood is sometimes fade; rub the stain with a steel ball, like hand squeeze pimples.


193, can use an ordinary gas meter in the cabinet door closed it? Need to use the shutter-type door it? Check regularly open air on the line.


194, clear contracting the tx Please note, we must validate the renovation team give you a list of materials. Their estimates may be me, I too believe that they, and the results of wires and line to buy is almost doubled.


195, the size of certain planned sanitary ware, the best sketch in advance, calculate the size.


196, students pay attention to the door to buy products, if you want to pursue results aid the panel with the affair package Door, then you may must be Henzai knife it!


197, Re: installation of water pipes are put before the leader and basin, sink have bought?
not, just determine where is the basin faucet, bathtub faucet, washing machine what's on the line leading, leading 99 percent sign and fell into the water are in line with worldwide norms, at all times workers are not reckless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. In front of the sink to determine the amount of good size units, installed in front of buy Haojiu Hang Taiwan, do not forget that the audience or on stage. Distance between hot and cold water pipes with cement tiles must be accurate before the closure of 15 cm, and must be parallel. If you have bought, it is best put something, such as sealed after the unpack.


198, if an 8-core cable in the meantime take the phone and network, will not mediate with each other it? Not. 1,2,3,6 buffet cable module, 4,5 hit the phone module, and the other two easily. My experience was right: 10M by 1236 100M in fact used to have the speed to 10/100M that we will not feel any different. If a 8pin line, then the signal will cause some program-controlled switches on the network signal interference in the home environment generally will not have any problem. But rest assured that I can recommend such a path will leave separately to the margin, the network cable is very cheap that you mention?


199, be sure to check the distribution box installed properly.


200, fitted bath and shower faucet lessons connected to the faucet pipe is embedded in the wall, and I again told them to size to get exactly, not to masquerade not in due time. The results left a hot and chilly water is 15 cm spacing, can be hot and chilly water pipes are not parallel, the outcome took a plumber just put on the compel feeding. Yesterday discovered that my fb leadership high temperature wrapping device actually does get cracked. If we can first load leading to the first installed it. Leader should be bought first, then install hot and cold water pipes, tiling it. Oujia bought early leader, is Oujia main to buy.
  Reply With Quote

Sponsored Links
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 12:19 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum