历史上的今天:
收藏到:Del.icio.us
VIDIMON shape control system of technical analysis
No. 4 rotor work record, I a 11 a 10-7-4-20 +3 +5 +8 + II +9 +7 +4 +1-3-5-9-9-12-12 a 10-8-- 4-3-1 +2 +5 +6 +8 +9 +12 +10 Table 2 +2-1-4-7 a 10-11 aluminum foil roughing mill exit thickness of 0.28mm, the driver side rotor 14 to the non-drive side of the rotor 14, work record, I a 13-11-9-7-4-1 +6 +2 +5 +9 +12 +8 +30-4-6-9-13-12-14- 12-8-6-5-2 +2 +5 +10 +14 +9 +7 +4 +1-2-5-8-13-13 VIDIM0N shape control system As a result known as the Pressure detection technology, allows measurement of the rotor under the action of the tension synchronous movement with the strip, no additional drive system. Rotor with good mobility, thus protecting the surface of the rotor and the strip. Meanwhile, the air of a power conversion device (pressure sensor) in the mill outside, do not need to capture the signal from the slip ring body, reducing signal loss and interference to ensure the control stability and control accuracy. When VIDIMON shape control system for aluminum foil, the finishing mill, due to the work of state dollars rolling rolling roll gap, so the pressure on the roll control system to perform the role of the tendency has been not very obvious, while roll bending control will upper and lower work rolls to form symmetrical Therefore, the control system will automatically suppress the following 0.04mm bending control. In order to ensure the accuracy of shape measurement, one to two years in normal use should be carried out after the re-calibration of the system, the use of special weights and bracket for all 29 calibration of each rotor normally takes about 1h. The use of It is necessary air compressors, dryers, filters, air cabinet,
Tory Burch Shoes, light metal with 56 * 1998, Chuan ◆ Chuanbo № 8. Ⅲ ◆ ... '◆. ¨ IIIl '~ b'll [I s ... ◆ Sichuan' ◆ management systems Liu Fengyun (Fushun, Liaoning, Fushun 113001) Abstract: This system is the aluminum industry, starting from the analysis of samples relevant data have been received to the computer management system. The system includes: a laboratory spectrometer data reception,
Tory Burch Flats, the conversion process , to review and modify,
Tory Burch Flats 9iT8Reva Tory Burch Sale Anonymous's Blog,
Tory Burch shoes, transmit Internet; for the quality department at all levels of quality analysis curve describes the query; for the plant display, print data reception section. Keywords: aluminum industry product testing computer is the life quality of management, especially in the aluminum industry , quality testing is particularly important. Now the domestic aluminum industry is used spectrum analyzer on the primary aluminum,
Tory Burch On Sale 4wGalouis vuitton bags sale th, finished aluminum, alloys, Front aluminum pole,Franklin and Marshall, aluminum pole products and other laboratory tests. larger aluminum, tested hundreds of samples per day , the previous manual operation as backward, not only waste a lot of manpower and time, but not conducive to the timely feedback of information,
Tory Burch Handbags,franklin marshall paris, and because error-prone. In order to improve product quality, timely and accurate production of the test results will be quickly reflected in the leadership at all levels and quality management at all levels of the hands is essential. particularly for primary aluminum (ie aluminum fluid) rapid test results accurately reflect the more important. operators in the most appropriate time to take samples for laboratory test for immediate and accurate feedback will go back to the basis of existing material, the ratio of the best products. Therefore, according to the technical characteristics and quality management requirements, the development of aluminum industry, product testing and quality analysis and management system. Laboratory: data processing data received indiscriminately data analysis, data query quality unit above the branch curve capture part of Figure 1 to receive vend deposited aluminum industry product testing and quality management systems of the total block diagram of the three modules of the application,tory burch London, so that the whole process of product inspection and quality analysis, standardized, modernized management. 1.1 The first module of the module is to achieve the laboratory data reception,Abercrombie uk, data conversion, review and modify, transmit Internet section. the function shown in Figure 2. '1 system functions throughout the system consists of three modules, as shown in Figure 1 said.,
Tory Burch Reva Sale 1kKOTory Burch Sale love Tory, Yi seventy-seven-e sets of equipment regular maintenance to ensure its reliable operation. 4 Conclusion VIDIMON shape control system in our company's operation shows that over the years, the system reliability, accuracy, control real-time performance can satisfy the aluminum plate, strip, foil, production needs, and the thickness of the automatic control system (AGC) with the use, I guarantee cold rolling mill, foil rolling mill and reliable operation. Li 1997-10-17, 相关的主题文章:
Tory Burch UK Ed Hardy kläder it is very important abercrombie et fitch