highlight the building of integrated transport and concentrate to build the Shanghai-Nanjing, along the river, along the East Longhai, coast, along the Grand Canal, Xuzhou-Nanjing-Hangzhou Xu Huai salt and the flow of modern integrated transport system.
about 1,000 km new railway. Build Beijing-Shanghai high-speed Railway (Shanghai-Nanjing section), accelerate the construction of Nanjing-Hefei railway section and so on,
babyliss hair, to complete the Beijing-Shanghai Railway (Jiangsu Section) and the East Longhai Railway electrification, planning and construction of the Yangtze River Railway Bridge.
new inter-city rail 450 km, about 100 km city light rail. Focus on building the Shanghai-Nanjing intercity rail transportation, construction as early as possible rather Hangzhou intercity rail, intercity rail Ningzhenyang start planning. Expedite the completion of the Nanjing Metro Line 2 to start construction of Metro Line 1, Suzhou, Changzhou and Nanjing Metro Line 1 subway line 3.
------
The official program is four lines in the original planning program based on the Changzhou subway expansion after a certain revision made. The program changes to the original program is not primarily to increase a line 5 subway lines,
cheap lacoste sneakers, other lines part of the section will be adjusted.
revision of the program after five subway lines form in Changzhou city within the city limits the total length of 170 km of station 125, which transfer station 19, the design Vision was on about 2.5 million passengers transported. The lines as follows:
(line name, mileage, station, marshalling, starting end)
1 line of 38 km, 27 stations, 6 * B, Newport - Nanxiashu;
2 号line 35 km, 25 stations, 5 * B, Yaoguan - West Center (branch to Zou Fu);
3 line 23 km, 19 stations, 4 * B, New Changzhou station - Radio Road;
Line 4 43 km, 29 stations, 4 * B, New Dragon - Hengshan Bridge;
5 line 31 km, 25 stations, 4 * B, Dongzhuang - City Village.
----------------
The program relative to the original plan a major increase in the east direction around the main northern city of Metro Line 5; 2 line increased by a main city center to the direction of the branch Boyi town; while the eastern suburbs, and Line 2 Line 4 adds a selected cross-transfer site; part of the site also made some line encryption. Optimization, the entire network system interoperability area,
puma classic, site density and so have been more substantial upgrade, the future of rail travel percentage share of public transport can also be increased from three to four Daowu Cheng Daosi Cheng. The program calculations are part of the urban lines, the lines can be long-term planning and development under the appropriate extension to the suburbs.
others:
潼关这个破地方
tory burch clutch sale
You can out of this room