Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Online Classifieds Directory

Online Classifieds Directory Online Classifieds are an often over looked method of FREE Advertising and way of getting your brand name out there, but just ask around...they work, if you work them.

Reply
 
Thread Tools Search this Thread Display Modes
Old 06-16-2011, 01:16 PM   #1
aoxuan9452
 
Posts: n/a
Default 5 hours of wood processing plant caught fire burne

Plant after the fire ignited the open space on the side of tons of stacked timber .
firefighters struggling to extinguish the fire.
a lot of wood ashes , and many tree trunks are burned.

(Reporter Wang Penghao ) the day before yesterday afternoon, Daxing District, North Zang village northwest of the village housing Sangma a timber processing plant at the fire , affecting a large pile of wood outside the ground . Fire Base Squadron biomedical Daxing after receiving the alarm , after nearly 5 hours of fighting , will eventually extinguish the fire.

day before 13:40 , Daxing biological medicine base of the fire command center 119 Squadron received notification that the North Zang village northwest of the village at the fire house Sangma . Alarm, the number of firefighters and two fire engines rushed to the scene. According to a fireman introduced in the way they were linked with the alarm that the fire house is a wood processing plant , the fire is in a violent burning phase. Understand this situation , control room and the mobilization of a bubble in the squadron Yufa fire trucks and fire engines rushed to the scene squadron of four reinforcement .

firefighters arrived,coach store, they found the fire had engulfed the south of a row of houses, wood piles to the factory quickly spread south .

firefighters after the victim asked that the wood processing plants are mainly wood processing side of furniture , on-site construction of the plant in the south , the east room for the residents , the west side of the road next to the North Side there are two motor-pumped wells . Based on that case , firefighters let the victim off the power immediately and arrange for a team set up more branch water cannon on the fire the plant, wood to fight the blaze . The other group is responsible for preventing gun fire continued to spread. To ensure adequate water supply , fire fighters also used a nearby water supply wells for the water tankers .

after nearly 5 hours of struggling to fight the blaze , firefighters eventually put out the fire completely . Subsequently,louis vuittion bags, the remaining residue to prevent the occurrence of the second resurgence of the fire , firefighters also used retractors to wood and some tools such as open burning of materials were examined .

the total burned area of fire of more than 300 square meters,coach factory outlet, the number of tons of wood were burned. At present,coach outlet store, the specific cause of the fire damage and accidents are still under investigation.

newspaper correspondent Lilin She
( Editor : SN009)
  Reply With Quote

Sponsored Links
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 04:51 PM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum