Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Free Advertising Forums Directory > General Free Advertising Directories

General Free Advertising Directories This is a list of general free advertising directories.

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 07-25-2011, 10:44 PM   #1
ertr7505o
 
Posts: n/a
Default Plan the afterward 2 weeks ( 2.4-1.13 )

First, the work
(a) several key
1, citizen issues, reporting technological and technological achievements,Asics Shoes sale, innovation fund; long-term project in one petition;
progress: years antecedent, has been submitted materials and other acknowledge off now open appraisal;
recent plan: to be completed this stage: agreeable convergence with the capable authorities to implement the Group menu, meeting arrangements, open appraisal must complete the required material [including: reporting PPT and session materials, pre-completing the certificate of authenticity, the charting of adept opinions] to arrange a ration.
the next phase to follow up: by the end of registration and assertion of results of scientific and technological achievements of the materials; application issues; Innovation Fund application in 2009; scale up the patent application (already obtained two patents received placard); research public relations (with SW technology commute of personnel); preparations to talk with YT-WSC letter of intent to promote or LF-WSC took YTW business.

2, resource pilot (focus: Back to signing the memorandum)
pilot observance has been completed, follow-up years ago may be approval, , then re-implement the specific place.

3 ,**** factory project (focus: Regulation Authority / joint approval will)
annuals ambition have passed the Planning Board business, the Commission have to emulate the rules or the coupler approval will be the circumstance;
a red line map, these charts, and labor tin be sorted Institute study, commissioned by the action may: start to win pre-Municipal Development and Reform project approval,Asics Running Shoes, and then commissioned the consulting heart of the provincial Development and Reform Commission);
introductions look Yang Dong Chen, intent on cooperation, signed the structure contract.

4, DYW project (follow-up focus King, Wu L, communicate with the position, to reinforce ties with the sovereign)
initially: the mode of operation (completed), the project site (two program options) scale: 50Ha;
has a preparatory site chart, but to be implemented, focusing above communication and follow-up results of Wang and L, if the introduction of NAN HAI YUANG instant progress of the project partners, signed a letter of intent apt promote the establishment of the tripartite project Working Group; arrangement of substances for approval premier determine planning and site selection, to carry out feasibility study, and to a certain degree of assembly of the project enterprise set up programs as treatment go and personal follow-up.

5, WZ extract bio-diesel project (to consult cooperation between Guangzhou and Dr. Xiang direction)
met with Dr. Xiang, on letter of intent; study Longgang project implementation;
feasible, the afterward tread to talk approximately specific cooperation intention to sign letter of intent / agreement (address: equity framework, chief, technology, business prototype); design and implementation of the route (project preparation materials, to do PPT);
specific implementation and progress of the control (check the new technology appraisal - reporting issues ... ...)

6, and ZENG'R br> (ii) the need to follow up
1, .
coincided by the chairman and Zhu Zhu namely responsible for contacting Institute Quartet conference (for New Year's ;
parties signed a cooperation letter of intent / memorandum;
parties signed a cooperation agreement
... ...
2, CIMC-YICT cooperation (10.10 3 parties have been reached,Asics Mexico 66 New Arrival, CIMC has given Liu JL procedure, follow-up of more than YICT feedback,Asics Mexico 66 Lauta, vacant pile surge in claim, gainful opportunities arise YICT own investment procedure of cooperation has not, but there may be turning, and I nourish adjoin);

3, XG 25,000 to (pre-declaration completed in 2009, for recent messages can be formally included in the next year huge plans; provocation program has been reported to chairman,Asics Gel Kinsei 2, to urge) (proceed to pay attention to the news information)

4, nano-hospital follow-up and cosmetics project cooperation approval (be-depth discussions with each additional, to understand its true intent).

Keywords: results of appraisal, pilot [back to sign the memorandum], integrated wharf [cooperation agreement], CIMC-YICT [i], XG2.5 [Tan], BH [Planning Commission / United Approval will, contract, project]

(c) the need to disburse care
document for ploughing groups and stakeholders to kernel affair systems, research DYW & CSPC.

two other
1,Asics For Women->, look at the fashionable CIVI & M6, exercise (do not concern about the form);
2,14 day school, there are plans to gather pertinent information strategy for book papers.
  Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 05:36 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum