la gear footwear, the Office of the units directly under:
to strengthen water conservancy construction and management of the province, standardized design changes, according to developed a What is the process of implementation problems please feedback to the Office of Construction Management Office.
June 26, 2029
changes in project design, Guangdong Province
Interim Provisions
the first province to strengthen water conservancy construction management, standardized design changes, according to , to introduce the Interim Provisions.
Article shall apply to the Interim types of medium-sized water conservancy projects in Guangdong Province (including new construction, expansion, renovation and reinforcement, etc.), small water conservancy projects can be implemented by reference.
Article III of the Interim Provisions
term project design changes, construction projects is based on the needs of the construction project required technical, economic, resource and environmental conditions, a comprehensive analysis, verification, approved the construction of preliminary design documents for engineering changes and other activities.
project construction tasks, or change the utilization of primary and secondary order, project level, the main hydrological parameters and results, building sites [such as the dam (gate) site, plant (station) address, etc.], dam dam type,
la gear mens shoes, and the change in station (power station) or the total installed capacity of more than 10% of total installed capacity of more than Provincial Water Resources Department to approve terms of reference, and does not belong to the scope of design changes,
la gear light, the project should be re-project,
la gear, or reported to have approval authority for approval.
Article
design changes according to their nature and extent of the impact of the project, divided into two major design changes, and general design changes.
based on preliminary design approval requirements in the proposed optimization design changes, in accordance with the general design change management.
Article
to approve the preliminary design of water conservancy project report and its approval, the opinion of the baseline review, major design changes include:
(a) of the reservoir (hub) Engineering
1. Add or remove important single hydraulic structures;
2. Dam (retaining structures) control the size of the main dam section (crest elevation, crest width) to change;
3. Dam (retaining structures) material change in the main dam;
4. spillway (spillway) Layout (axis, cross section, energy dissipation, gate hoist way) to change;
5. Dam, spillway foundation treatment programs fundamentally change;
6. reservoir bank processing program changes;
7. reservoir resettlement plan changes.
(b) of the dike project
1. Embankment axis changes;
2. Embankment type of change;
3. Treatment options based on fundamental changes;
4. medium above Levee Building (design maximum flow ≥ 100m3 / S) Layout (axis, cross section, energy dissipation, gate hoist way) to change.
(c) of the sluice (hub) Engineering
1. sluice Layout (axis, cross section, energy dissipation, gate hoist way) to change;
2. chamber of the main parts of the control size (number of gate holes, crest elevation, gate top elevation) change;
3. sluice of the main treatment options based on a fundamental change in engineering.
(d) pumping station (power plant) project
1. pumping station (power plant) layout program (axis, energy dissipation) to change;
2. the total installed capacity to change (no more than 10 %);
3. pumping station (power plant) units Number of units to change;
4. Pumping Station (Station) host group type change;
5. water way to change;
6. based treatment programs fundamentally change;
7. electrical main way to change.
(e) Irrigation Project
1. Channel functions and duties change;
2. Important changes in canal building layout plan;
3. Important changes in canal building construction plan.
major design changes other than the design changes, the general design changes.
Article
design change management at different levels.
(a) of the local project
prefecture level and county (including county-level cities, districts) where the approval of major design changes to the project by the prefecture-level cities and counties (including county-level city, district) water administrative department for approval;
and above the provincial level where the project examination and approval of major design changes by the provincial department of water administration approval;
General design changes
corporate body by the project construction, design, supervision and other review of the flats, the water project director reported to the competent administrative department for approval before implementation, report the approval of listing of the water level in order to the administrative department for the record.
send a copy of approval of design changes for approval departments (units) and at the same level of development and reform, financial sector.
(b) directly under the Office of the Project
directly under the Office of the significant design changes project the preliminary design of the original approving authorities for approval, usually owned by the engineering design changes Basin Authority for approval.
(c) of the resettlement project
Resettlement
really necessary adjustment or modification shall be submitted to the original approved project outline resettlement planning authorities.
Article
without examination and approval of design changes may be implemented; design changes approved in principle, change it again.
dismantle any unit or individual may circumvent the approval of the contents of design changes.
Article VIII
water administrative departments at all levels shall strengthen the activities of water project supervision and management of design changes.
Article IX
major project design changes, design changes by the commitment to the design of construction design engineering unit is responsible for the preparation of the report design changes, and assume the corresponding responsibility.
Article
major design change approval procedures for the preliminary engineering design report with reference to the approval procedures. Design changes in the project legal documents submitted, shall submit the following materials (written materials in six copies,
la gear walking shoes, electronic documents two):
(a) description of design changes, including the project survey, design change is happening, change the project or the contents, change the basis for programs designed to change the technical and economic comparison, changes investment change, change quantities, Engineering Unit , change the contents of project construction and other technical requirements,
la gear police, design changes the depth of the report stage of the preliminary design should meet the requirements of standards and regulations, conditions may be the construction design stage for the preparation of the design depth;
(b) survey and design change the original design drawings and related design drawings;
(c) project the amount of investment change takes control list and breakdown of the budget document.
(d) with the above text, drawings of electronic documents.
Article XI of engineering design changes to increase the amount or the implementation of the project, in accordance with the Tendering and Bidding Law and related laws and regulations of the relevant regulations.
Article XII examination and approval of engineering design changes, changes in the investment basis adjustment as the project budget; investment budget approved by the relevant regulations.
Article XIII
major design change projects, project administration department should analyze the water caused by reasons and relevant units held responsible; in accordance with the the bad behavior that standard, ascertain the flats in accordance with regulations to report bad behavior.
around the level listing of Article XIV of the water administrative department according to the actual situation in area, according to the provisions of the development in the region of the change management project design details.
the provisions of Article XV of the Guangdong Provincial Department of Water Resources is responsible for the interpretation.
Article XVI
the date of issuance of the regulations come into operation.